12
5.
Loosen the beam hood screws, remove the bolts from the beams.
6.
Put the four Dyneema textile shackles on beam for blocking the wings (W1029)
7.
Position the front beam and introduce the bolts in it without tightening them. Repeat the
procedure with the back beam.
If the bolts are not immediately facing the hulls holes, gently move up the hulls front or back.
8.
Do not immediately tighten the bolts in order to facilitate the trampoline positioning.
9.
One must comply with the maximum onboard weight of 152 kg.
If the onboard weight
exceeds 152Kg one must increase the buoyancy reserve of each hull. Compensate each Kg by
increasing the buoyancy of one liter. As an example if the onboard weight is of 200Kg, one
must increase the buoyancy reserve of 48 liters (24 liters per hull). In order to do so, you may
introduce 6 polyethylene foam noodles of 4 liters each in each hull via the hatches
6.2.
Trampoline
1.
See the List of parts on page 7 (and further) and take Trampo Assy, Big box Trampo Assy et
Big box/ Trampo/ MS.
2.
Remove the front beam cover.
3.
Insert the trampoline bolt-rope in the beam groove.
4.
Center the trampoline, then set the winch pulleys Harken 2625) with the textile shackle
(PA1901) in the eyelets and corresponding saddle.
5.
Put soapy water (ideally some teflon) in the hull groove.
PLATFORM
Содержание Essentiel
Страница 1: ...ASSEMBLING MANUAL...
Страница 4: ...4 2 Overview OVERVIEW...
Страница 5: ...5 OVERVIEW...
Страница 16: ...16 15 Install Main Sail tackle using the trailor axis PLATFORM...
Страница 17: ...17 6 3 Platform Ropes Plan PLATFORM...
Страница 23: ...23 MAST MAST...
Страница 24: ...24 MAST...
Страница 27: ...27 MAST...
Страница 29: ...29 BOWSPRIT...