![Fluke Reliable Power Meters 1941 Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/fluke/reliable-power-meters-1941/reliable-power-meters-1941_installation-manual_2309980022.webp)
Installing the Multipoint with
Acquisition Unit Model 1941 or 1948
14
Connecting to Current
Following are instructions for connecting a Multipoint Base Unit to a
permanently installed CT with a 5 Amp secondary. For other
applications, consult with Reliable Power Meters’ Customer Service.
Note:
If you’re using an Acquisition Unit model 1942 or 1949 for use
with Reliable Power Meter current clamps, be sure to follow the
instructions on pages 20 to 33.
1.
If necessary, mount your external metering CTs on the busbar or
current source, as required.
WARNING:
To avoid potential injury or equipment
damage, the secondary must be kept shorted until
permanent connection is made to the Multipoint.
2.
Hook up the secondary of the external metering CTs to the
current measurement terminal strip on the Multipoint Base Unit.
Gauge 20-8 AWG/0.5 to 6mm
2
Stripping length 0.28"/7 mm
Содержание Reliable Power Meters 1941
Страница 2: ......