8.
Become familiar with the operation of the furnace before installing the
metal freeze point cell.
15
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
MH1
MH6
CUTOUT
CONTROL
J10
BLACK - CUTOUT (+)
RED - CUTOUT (-)
White
J2
1
2
3
4
5
Green
Red
Black
NC
Figure 3
Attachment of thermocouples
Содержание 9116A
Страница 1: ...9116A Furnace User s Guide Rev 842101 Hart Scientific ...
Страница 24: ...19 Figure 5 Back Panel ...
Страница 28: ...9116A Furnace User s Guide 24 Figure 6 Controller Flow Chart ...
Страница 56: ...53 8 Fixed Point Cell Installation Instructions Procedure Figure 14 Place insulation in re entrant well ...