The 1/4 in. molstic-S™ is delivered with integrated 
shut-off/metering valves.  These valves provide a 
measure of flow control for use when calibrating 
devices that do not have their own flow control means.  
However their primary use on the molstic-S is to 
provide a means of positive flow shut-off to allow for 
system leak testing.  The 1/4 in. low-flow and 1/4 in. 
mid-flow metering valve kits provide higher precision 
flow control capability. 

Use the 1/4 in. metering valve kits with the following 
molbloc-S

®

 ranges and molboxes™: 

Table 1

  Metering Valve Use with molbloc-S

 

 

MOLBOX1-A700K  MOLBOX1-A350K 

Low-Flow, P/N 401885 

5E1-S 5E1-S 

Mid-Flow, P/N 401666 

1E2-S, 2E2-S 

1E2-S, 2E2-S 

 

 

INSTALLATION OF 1/4 IN. METERING 
VALVE ONTO MOLSTIC-S PLATFORMS 
WITHOUT REGULATORS 

Use the following procedure to install the metering 
valve kit onto the molstic-S platform that does not have 
the integrated regulator: 

  Attach the valve bracket to the base of the valve 

using the two included #10-32 socket head cap 
screws, the two #10 flat washers and the two #10 
lock washers.  The long side of the bracket should 
be perpendicular to the direction of flow through 
the valve. 

  Using a pair of properly sized wrenches, break the 

connection between the downstream end of the 
filter element (1) and the female VCR

®

 swivel nut (2) 

on the inlet of the molstic-S.  Do not disassemble 
the parts on the inlet side of the filter element (1).  
Discard the VCR gasket, which is for one-time use. 

  Place a new 1/4 in. VCR gasket (P/N 102183) 

securely against the sealing surface inside the female 
VCR swivel nut (2) of the molstic-S inlet. 

 

 

  Place the metering valve and bracket assembly (4) 

onto the molstic-S platform and align the VCR 
connection.  Assure that the flow direction of the 
valve matches the direction of flow of the molstic-S. 

  Tighten the female nut (2) finger-tight. 

  Hold male body stationary with a backup wrench.  

Tighten the female nut (2) 1/8 turn past finger-tight. 

 

 

 

 

Thread the included double female VCR union 
(non-swivel type), (3), onto the inlet fitting of the 
metering valve.  Leave it approximately one full 
revolution from the fully stopped position. 

 

Place a new 1/4 in. VCR gasket (P/N 102183) 
securely against the sealing surface inside the 
double female VCR union (non-swivel type) (3). 

  Install the filter (1) and upstream plumbing into the 

female VCR union (3).  Tighten the female nut 
finger-tight. 

  Hold male body stationary with a backup wrench.  

Tighten the female nut 1/8 turn past finger-tight. 