background image

6

ASSEMBLY INSTRUCTIONS

Take caution when handling light bars. Ensure the LED 
array does not come in contact with sharp objects or 
force that may damage the diodes.

Unbox and unfold module and place on flush, s
table surface . 

There are two ways to mount your power supply: attach 
to the light bars or remote mount to a surface . 

   A. 

Ensure the quick-release mechanism on light  

 

  bar clip is positioned according to diagram before  

 

  sliding into place . The spring tab will lock light bar into  

 

  place when properly centered .

    

i.

 When the module is unfolded and LEDs are  

 

    facing down against the flush surface, attach  

 

    Power Supply Light Bar Brackets to the center  

 

    two bars and press firmly until they snap into place .  

    

SAFTEY NOTE: Light Bar Brackets must be  

 

    installed only on the light bars and parallel to  

 

    the ground mounted to the light bars

1

2

Содержание SPYDR 2i

Страница 1: ...2p SPYDR 2i IMPORTANT SAFETY PRECAUTIONS EXPLANATION OF SYMBOLS 2 BEST PRACTICES 2 GENERAL CARE 3 SYSTEM HARDWARE ACCESSORIES 5 ASSEMBLY INSTRUCTIONS 6 TECHNICAL SPECIFICATIONS 8 CAUTIONS WARNINGS 11 PRODUCT GUARANTEE WARRANTY 12 ...

Страница 2: ...ty If the provided plug foes not fit your outlet consult an electrician to replace your obsolete outlet If you replace the power cord only use one of similar type and equal or greater current rating The system should only be cleaned as directed in the manual You should seek service for your system by qualified service personnel if any of the following occur 1 The power supply cord or the plug has ...

Страница 3: ...utinely check for and remove excess dust debris and mineral build up from heatsink and LED array Cleaning should always be done with the fixture unplugged from its power source using low pressure compressed air or water to rinse away dirt from light bars Never use a cloth to clean the diode array Doing so can scratch or compromise the integrity of the silicon seal or dislodge diodes entirely To li...

Страница 4: ...4 SPYDR 2 SPYDR 2x SPYDR 2p SPYDR 2i ...

Страница 5: ...erfall Mount C2 Solid Decking Mount C3 Sloped Decking Mount C4 Lance Hanger C5 Lance Hanger with Adjustable Kit option if upgraded at time of purchase ACCESSORIES D 1 Vinyl cut Fluence Sticker E Power Supply Accessories E1 1 6 AC Power Cord 1 15 AC Power Cord option if upgraded at time of purchase E2 1 3 or 6 DC Extension Cord option if upgraded at time of purchase E3 2 Power Supply Light Bar Brac...

Страница 6: ... a surface A Ensure the quick release mechanism on light bar clip is positioned according to diagram before sliding into place The spring tab will lock light bar into place when properly centered i When the module is unfolded and LEDs are facing down against the flush surface attach Power Supply Light Bar Brackets to the center two bars and press firmly until they snap into place SAFTEY NOTE Light...

Страница 7: ... the bracket mounts with the bracket receivers iv Reach under the power supply and twist the bracket locks into place v Once the power supply enclosure is installed do not attempt to fold the SPYDR 2 module Doing so will cause significant damage to the fixture B Remote mount To remote mount the power supply refer to the mounting instruction manual ...

Страница 8: ... 1 87A Family Model Spectrum Input Voltage AC Power Cord AC Plug DC Extension Cord Mounting Hardware SR SPYDR 2x X I PhysioSpec Indoor 1 100 277V 06 6 0 1 83m N5P NEMA 5 15P 00 None W Waterfall Mounts 2p PLUS 3 347V 15 15 0 4 57m N6P NEMA 6 15P 03 3 91cm S Solid Decking Mounts 2i i 4 400V L7P NEMA L7 15P 06 6 1 83m M 2 Point Hanging Lances 5 480V TFP Schuko Type F M 2 Point Adjustable Hanging Kit ...

Страница 9: ... 27lbs 11oz 108 7cm L x 119 4cm W x 10 9cm H 12 55kg 42 8 L x 46 99 W x 4 3 H 27lbs 11oz 108 7cm L x 119 4cm W x 10 9cm H 12 55kg Mounting Height 6 15 2cm Above Canopy 6 15 2cm Above Canopy 6 15 2cm Above Canopy Thermal Management Passive Passive Passive Dimming 0 10V 0 10V 0 10V Light Distribution 120 120 120 Lifetime L90 54 000hrs L90 54 000hrs L90 54 000hrs Power Factor 90 90 90 Certifications ...

Страница 10: ...10 46 99 119 4cm 42 8 108 7cm 20 8 52 8cm 3 1 7 9cm 2 4 6 1cm 16 7 42 4cm 21 9 55 6cm 42 8 108 7cm 6 2 15 9cm 1 3 3 2cm 4 3 10 9cm Dimensions ...

Страница 11: ...ilation of fixtures and power supplies ETL Rating SPYDR fixtures are rated suitable for wet locations A wet location is defined as an interior or exterior location in which water or other liquids may drip splash or flow on or against the electrical components of a lighting fixture SPYDR Series fixtures and power supply are certified to meet UL standards ETL from the Intertek safety consulting and ...

Страница 12: ... date of purchase Contact us at support fluencebioengineering com for information on five year extended warranties We stand behind our research we stand behind our technology and we stand behind our clients www fluence science warranty 512 212 4544 fluence science Copyright 2018 Fluence Bioengineering Inc Version 1 09 2018 71038A Review our products share your grow and stay abreast of the latest F...

Отзывы: