SVCN 7 INSTALLATION, OPERATION, & MAINTENANCE
Washer
Pipe
Bolt
Allow bolts to project for
grouting under baseplate
Make this distance equal
to flange on baseplate
Figure 2-2 Foundation Bolt Template
Allow ample threaded bolt
length above rough concrete
Stuff waste around bolt
while pouring concrete
Pipe sleeve to be three
times the diameter of
the anchor bolt
Weld a large washer with
lugs to the bottom of the
bolt and pipe sleeve to
prevent turning
Rough finish
concrete for grout
Figure 2-3 Foundation Bolt
2.1.4 LEVELING THE BASEPLATE
Before putting the unit on the foundation, thoroughly clean the top of the foundation. Break off any
loose pieces of cement and roughen the top with a chisel to afford a good hold for grout.
- 2-3 -
DO2604-13