Issue Date: November 21, 2016 Copyright:
FLOWSERVE SIHI Pumps Rev 1
Caution! Jamming during lifting up.
Therefore:
Lift the pump casing upwards vertically! The screw
spindle pair has a very close clearance to the inner
wall of the pump casing. When lifting take care that
the pump casing does not jam with the screw spindle
pair. Should it happen, the pump casing must be
lowered slightly and the lifting process must be
repeated.
During disassembly take care that fingers do not
become trapped between the rotors. The rotors have
sharp edges so the wearing of strong work gloves is
recommended!
Notice! Improper usage of hazardous substances may
damage the environment.
Therefore:
Coolant must not enter the local sewerage system.
Observe the environmental regulations!
10.5.2 Assembly
Assembly is performed in the reverse sequence to that for disassembly. The O-rings and seals must
be replaced by new ones. The following section describes special aspects to observe when
assembling the vacuum pump. Observe the safety precautions in accordance with 10.5 Disassembly /
Assembly and the weight specifications in the following chapters.
Caution! Original Parts Must Be Used
Therefore:
All parts must be replaced only with the original spare
parts so as to ensure functionality of the system.
All parts of the vacuum pump, especially its sealing
surfaces, must be handled carefully.
All exposed gaskets and seals must be replaced.
The enclosed circuit diagram must be followed for
electrical connections so that the functional and
operational safety of the pump and the unit is not
hampered.