40
3.19 Routine Maintenance
Recommended Schedule
PARTS
DAILY
Check Suction And Discharge Gauges.
Check For Abnormal Operating Conditions (High/Low Temperature,
Flows, Vibration, Pressures Etc.)
Check Motor Current/Driver Power.
Check For Leakage From Seals, Joints.
Check All Lubricant Levels Ie. Bearing Housing Oilers, Seal Plan 52/53,
Seal Supply Systems As Applicable.
Check For Free Flow Of Cooling Medium As Applicable.
Check Stand By Pump is At Applicable Temperature And Available To
Start As Required.
WEEKLY
Check Unit Vibration.
Check Operators Log For Loss Of Unit Performance.
MONTHLY
Check For Lubricant Contamination Whether Bearing Oil, Or Seal Oil (If
Applicable) By Sample Analysis.
Check All Paint Or Protective Coatings.
Check All Power/Instrument Cable Glands For Tightness.
6 MONTHLY
Change Lubricants.
YEARLY
Check Foundation Fixing, Bolting, Grouting For Looseness, Cracking Or
General Distress.
Check Unit Alignment Against Previous Inspection.
Check Calibration Of Instruments.
3 YEARLY
Check Internal Condition of Pump And All AncillaryPipework For
Corrosion/Erosion.
Check Internal Pump Components For Wear.
NOTE
This schedule is a recommendation only and is intended to be amended by site experience
of the prevailing conditions. It outlines recommendations for the pump only and must be
supplemented by schedules for other equipment on the package