Upon completion of the inspection the FLOWSERVE representative shall submit a report to the
purchaser, and to the Manager of Customer Service, stating in detail the results of the inspection.
One month prior to installation of the equipment, an FLOWSERVE representative is to be
employed to conduct a final inspection. This inspection will be made to assure that the
requirements of the six months inspection report were satisfactorily completed and that the
equipment is ready for installation.
Upon completion of this inspection the FLOWSERVE representative shall submit a final report to
the purchaser, and to the Manager of Customer Service, advising the results of the final
inspection.
All costs involved in conducting the final inspection will be to the account of the purchaser.
Prior to and during start up, any requirements for the services of an FLOWSERVE representative
will revert back to the original contract agreement for equipment purchased, with revised costing.
1.23 Painting and preservation
Paints and preservatives used are either FLOWSERVE standard or 'special' as required by the
contract specification. Refer to your branch office through which the order was placed, or
FLOWSERVE for the description of paints and preservatives used on this order.
1.24 Associated equipment
Motors, Turbines, Gears, etc., being supplied by FLOWSERVE.
Generally rotors of associated equipment should be blocked to relieve bearing loads. Storage
should be indoors and dry. See the specific manufacturers storage requirements.
1.25 Lifting equipment
WARNING
Make sure that any equipment used to lift the pump or any of its components is capable of
supporting the weights encountered. Make sure that all parts are correctly rigged before
attempting to lift.
1.26 To Lift unit
Pump, driver and baseplate can be lifted as a unit. Sling from all four (4) eye bolts provided on
baseplate side rails. Failure to use all four (4) could result in permanent distortion of the baseplate.
Use as long a sling as possible, or use a spreader arrangement.
WARNING
Coupling bolting and spacer piece must be removed from between pump and driver half
couplings before lifting baseplate with pumping element.
To lift pump and baseplate, less driver, or baseplate alone, sling from all four (4) eye bolts.