FlowCon ABM Скачать руководство пользователя страница 4

DYNAMIC BALANCED

TEMPERATURE CONTROL VALVE

FlowCon ABM

        

1M95000ISO 

04/2016

FlowCon International assumes no responsibility 

for mistakes, if any, in any printed material.

Denmark 

Dubai 

USA 

Singapore 

www.flowcon.com

- 4 -

Choice of insert

FlowCon ABM valves can be installed with either 

a standard composite insert, internally adjust-

able to one of eight flow rates or the FlowCon 

E-JUST insert, externally adjustable to one of 41 

different flow rates in the same insert. Alterna-

tively, a factoryset stainless steel insert can be 

installed with an adaptor.

It is recommended that the o-rings located 

around the insert and adaptor are lubricated with 

silicone grease, before the insert/adaptor is in-

stalled into the valve body. 

IMPORTANT:

 Never 

use mineral oil or petrol based grease or oil on 

the o-rings.

If the stainless steel insert needs to be ex-

changed, it is necessary to slightly cut the sides 

of the grips on the adaptor with a  box knife and 

remove the insert by pulling the two now flexible 

grips outwards on each side of the adaptor with 

one hand and pulling the stainless steel insert 

from the adaptor with the other. The o-ring will 

come out as well.

Before installing the replacement insert, the 

black composite part also needs to be replaced. 

Simply remove the composite part using a small 

piece of steel or brass bar or similar tool (ø10mm 

and 150mm length). Place the ancillary tool 

through the composite part  and push down until 

the part loosens a little; no need to use much 

force. Then do the exact same thing from the op-

posite side of the part and the composite part is 

now free and can be easily removed from the 

brass head nut by hand.

The

 

new composite part is placed into the brass 

head nut. Please be aware of the two marks 

on each side of the composite part; these must 

fit into the two grooves on the brass head nut. 

When in place, push the two parts together until 

they click and the adaptor is ready for use.

Содержание ABM

Страница 1: ... on both the connection and piping should be cleaned carefully As these models are union end con nected the union nuts and the end connections should be removed for installation O rings are supplied with the valve body and used to seal the connections It is recommended to grease the o rings with silicone grease before installation IMPORTANT Never use mineral oil or petrol based grease or oil on th...

Страница 2: ...t with an 8mm wrench to a torque of 6 7Nm 4 Slide the mounting bracket under the actua tor Ensure free movement of the slot at the base of the actuator The bracket pin must be placed in the mid distance of the slot Manual over ride operation 1 DISCONNECT POWER Failure to discon nect power may cause damage to the actua tor gears 2 Fit the manual over ride key onto the valve spindle 3 Press the clut...

Страница 3: ...2 position 24VAC 3 POINT FLOATING CLOSED 80 90 CLOSED 0 10 COMMON COMMON 22 SUPPLY 26VAC 28 32VDC 1 2 3 DRIVE CW SW1 4 6 7 8 DRIVE CCW COMMON SUPPLY 22 26VAC 28 32VDC 2 10VDC 1 2 3 24V MODULATING 2 10VDC 24V MODULATING 4 20mA SW JP1 Jumper at bottom 1 COMMON SUPPLY 22 26VAC 28 32VDC 4 20mA 1 2 3 SW JP1 Jumper at top 1 CLOSED 80 90 CLOSED 0 10 COMMON COMMON SUPPLY 220 250VAC 50 60Hz 6 7 8 DRIVE CW ...

Страница 4: ...ssary to slightly cut the sides of the grips on the adaptor with a box knife and remove the insert by pulling the two now flexible grips outwards on each side of the adaptor with one hand and pulling the stainless steel insert from the adaptor with the other The o ring will come out as well Before installing the replacement insert the black composite part also needs to be replaced Simply remove th...

Страница 5: ...if any in any printed material Denmark Dubai USA Singapore www flowcon com 5 Figure 7 D2 D1 A E B1 B2 B3 C F E Assembly drawing FlowCon ABM A Valve housing B1 E JUST insert B2 Standard composite insert B3 Stainless steel insert w adaptor C Adjustment key D1 P t plug 2 pcs D2 Plug and gasket 2 of each E Union end connections F Actuator ...

Страница 6: ...be suitable treated clean and free of debris It is recommended that a strainer be installed prior to the valve body to prevent damage or blockage due to debris Ensure that the valve is not in the fully closed position when filling the system with water Further it is recommended not to exceed maximum differential pressure control range for the insert paricularly for the diaphragm type Warranty obli...

Страница 7: ...IC BALANCED TEMPERATURE CONTROL VALVE FlowCon ABM 1M95000ISO 04 2016 FlowCon International assumes no responsibility for mistakes if any in any printed material Denmark Dubai USA Singapore www flowcon com 7 ...

Страница 8: ...IC BALANCED TEMPERATURE CONTROL VALVE FlowCon ABM 1M95000ISO 04 2016 FlowCon International assumes no responsibility for mistakes if any in any printed material Denmark Dubai USA Singapore www flowcon com 8 ...

Отзывы: