![flowair ELIS DUO Скачать руководство пользователя страница 13](http://html.mh-extra.com/html/flowair/elis-duo/elis-duo_operation-manual_2307902013.webp)
www.flowair.com |13
4.6. VERTICAL
INSTALLATION
WITH
BRACKETS
REGARDS ELIS T2-W-100; T2-W-150; T2-W-200; T2-N-100; T2-N-150; T2-N-200;
Set for vertical mounting consists of two metal consoles, among which is retractable curtain. The kit includes upper, lower bracket
and a set of pins with nuts bolts to screw the brackets to the air curtain.
Set for vertical installation should be screwed to the wall. In the air curtains holes screw 2 pin M8 (see section 6 and 7) and then
screw the bracket to the air curtain. Pins should be screwed into the hole minimum 20mm thread length.
1
3
ELIS
Dimension
A
[mm]
T2-..-100
965 +/-5
T2-..-150
1465 +/-5
T2-..-200
1965 +/-5
2
4
5
6
7
8