background image

Electrolyte Level Sensor

Installation and Operation Instructions 

when 

adding to an existing watering system

Contents

(1) Eagle Eye Industrial Electrolyte Level Sensor (4) Zip Ties
(1) Instruction Sheet

(2) Screws

(1) No-ox Grease

(1) Swivel Tee

Tools Required

PPE
Screw Driver
1/4” Nut Drive

Specifications

Max Current Draw: 7mA
Nominal Operating Voltage:  12 - 48V
Operating Temperature: -22°F - 158°F

Replace with the sensor valve as shown. Use care 

when helping the probe find its way into the cell.  

3

Locate your battery posts (positive and negative). 

We recommend that you place the probe as close to 

the center of the pack as possible. 

Probe cannot be 

installed within three cells from a battery post (red 

or black area as shown above). 

Select a valve from a cell located near the center of 

the battery, remove the swivel tee and valve.

2

Rotate clockwise to lock the valve in place and 

reinstall swivel tee. (If this is a new install, connect 

swivel tee to the valve and connect tubing.)

4

Secure the control box with a zip tie provided in a 

secure location. Do not secure to watering system 

tubing.

5

Take cover off of first inter-cell connector available 

on each end for placing the red and black wires. We 

recommend powering over the entire battery up to 

48 volts.

6

1

Pos

Neg

BL-627 102519

Отзывы: