background image

RAFTERS

1.

 To assemble ra

ft

ers, slide each Ra

ft

er End (with metal sleeve) onto a Ra

ft

er Base Stub, keeping the 

metal end up.

2. Slide three of the Ra

ft

er Center sections through the Ridge Support Joints. The remaining Ra

ft

er 

Center sections will sit  

on top

 of the Ridge Pole. 

3

. To connect the Ra

ft

er sections, simply push each plastic end of the center sections down and into 

the corresponding metal end of the Ra

ft

er Ends. Keep pushing down until you feel it pop into place.

4

Содержание TrimLine 10' x 20'

Страница 1: ...1 Topper Roof Plastic Rafter Poles 14 Rafter End sections with metal connector on one end 7 Rafter Center sections 6 Sidewalls 10 ft wide x 7 ft high Joints 4 Tie down Screws 8 10 Steel Spikes 14 Ball Bungees for bundling poles 26 Thumbscrews includes 1 spare Hardware 2 Corner Joints ATL4 L Left Side Rafter Base 2 Corner Joints ATL4 R Right Side Rafter Base 2 4 Way Rafter Bases ATL5 8 Rafter Bases...

Страница 2: ...no color code Male and female sections click together to form 9 identical 116 poles no color code 3 Gable Risers 26 with snap buttons at both ends 6 Telescoping Leg Assemblies lower section is nested inside upper section For 8 ft wall height you will also receive 15 Upper Leg Extenders For 9 ft wall height you will also receive 27 Upper Leg Extenders Page 2 Male and female sections click together ...

Страница 3: ...stalled during set up of the canopy Reviewing all instructions before beginning set up will help ensure that you have the necessary accessory parts in place as you set up your TrimLine The TrimLine Canopy can be set up by one person but as with any canopy set up is easiest with a little help Visit our website to see all options available for the TrimLine Canopy www flourish com Please assemble the...

Страница 4: ...ales Telescoping legs arrive nested together with the bottom section inside the top section Male Female Tee Joint 2 Way Ridge Support Corner Joint Foot StaBar Ell StaBar Tee Rafter Base Before beginning assembly for the first time take a moment to start thumbscrews on all joints equipped with a receiving nut 2 4 Way Rafter Base StaBar 3 Way Ridge Support Arrow must point DOWN ...

Страница 5: ... Joints to center of the no color poles and click into place Take care to center the joint over the seam where the pole sections connect 6 Insert the no color poles into the Corner Joints as shown below The Rafter Base Stubs should be facing up and towards the center of the frame 7 Add the short 26 riser poles to the Tee Joints and top them with the Ridge Support Joints at the ends and the 2 Way R...

Страница 6: ... of the Rafter Center sections through the Ridge Support Joints The remaining Rafter Center sections will sit on top of the Ridge Pole 3 To connect the Rafter sections simply push each plastic end of the center sections down and into the corresponding metal end of the Rafter Ends Keep pushing down until you feel it pop into place 4 ...

Страница 7: ...r re folding the top at the end of the show can be found on page 9 3 With the top stretched over the frame lift the valance along the front edge and attach the Velcro straps around the frame pole to hold the top in place as you lift the canopy The rest of the straps will be easier to attach after the legs are put in place 5 Vents Now is the easiest time to access the heat wind vents although they ...

Страница 8: ...r section This is the rest stop position 4 Slide feet onto the bottom of each leg rotating until the snap button on the leg snaps into the hole on the foot Tighten the thumbscrews on the feet finger tight only 1 Begin by holding leg upright with the row of holes towards the bottom of the leg Line up the snap button at the very bottom with the row of holes then start pulling the inner nested sectio...

Страница 9: ...t center leg into 4 Way Rafter Base With this leg in place you can walk to either end and attach the other two legs into the Corner Joints 2 With the front legs attached step inside and finish attaching Velcro straps to the frame 4 Lift the back edge now and repeat the process with the rear legs 7 ...

Страница 10: ...pper from left to right Stepping outside the canopy zip sidewalls to each other at the corners Use Velcro wind straps to attach wall to leg when one or more wall has been removed or rolled up 3 Pull topper snug at corners overlapping and attaching Velcro flaps at ends of valances Note that the heavy duty zippers on the TrimLine are self lubricating They may be stiff at first but will handle with e...

Страница 11: ...orner Joints Rafter sections can now be separated 6 The rest of the poles and joints can now be disassembled starting with the ridgepole and working your way down until you have pole sections that can be stored in the optional Pole Bags or bundled with Ball Bungees 3 Loosen thumbscrews and remove the rear legs leaving the center leg until last With the rear legs removed you can step inside and rem...

Страница 12: ...age consider our Pole Bags The Spikes and Tie Down Screws are intended for use on grass or dirt On streets or other hard surfaces you will need to use weight to anchor your canopy Our optional GreatWeights are a great way to add weight to the TrimLine Dirt can be cleaned from walls roof and awnings with any regular non abrasive liquid household cleaner A soft brush may be used if necessary Always ...

Отзывы: