OPERATING INSTRUCTIONS
9
Operating Instructions
1.Turn on the power switch
Connect the power cable to the socket and turn on
the power switch.
2. Install the air cushion film on the feeding
roller
Load the film roll into the feeding roller and
pass the film through with the air channel
side down. Pull film the inner side of the film
tension column A, pass through the film
tension B.
3. Preparation of air cushion production
Open the air channel and put film into air
nozzle to pass through the air channel until the
film is 1cm behind the wheels. Press the
„START“ button for a longer period until the
film is 5cm behind the wheels.
Содержание AIRBOY nano4
Страница 1: ...nano4 OPERATION INSTRUCTIONS ...
Страница 20: ...OPERATING INSTRUCTIONS 19 Why do I like working with the AirBoy nano4 ...
Страница 21: ...OPERATING INSTRUCTIONS 20 Why does my colleague like working with the AirBoy nano4 ...
Страница 22: ...OPERATING INSTRUCTIONS 21 Pictures of our team with the AirBoy nano4 ...
Страница 24: ...OPERATING INSTRUCTIONS 23 ...