background image

Base

 

We cannot emphasis how important it is to have a proper base for your Greenhouse to be erected upon.

 

It is essential that the 

BASE  IS  FLAT,  LEVEL  AND  SUBSTANTIAL

 enough to take the weight of the 

greenhouse including its polycarbonate panels or heavy glass.

 

Give yourself enough room around your base to allow for fitting the polycarbonate panel or glass and any 

ongoing maintenance / cleaning. A slab base which is larger than the greenhouse is the ideal solution and 

is our preferred foundation. If you use supplier's original base, also recommended.

 

A brick perimeter base is equally suitable providing there is a concrete foundation beneath it. We suggest 

using a solid brick with no frogs or holes (quality stock bricks or semi

-

engineering bricks).

 

IMPORTANT

: Do not  anchor  your greenhouse down until it is fully assembled including glazing unless 

you are 100% sure your base is square and level. If not your polycarbonate panels or glass will not fit 

properly. 

 

A (mm)

 

B (mm)

 

 

GS010994

2496

 

1886

 

2496

 

OPTION 1: base on grass

 

OPTION 2: base on slabs

 

OPTION 3: base on concrete

 

with drainage holes

 

OPTION 4: no base on brick

 

GS010993

Содержание GS010993

Страница 1: ...RC Series Greenhouse Article No GS010993 GS010994 ...

Страница 2: ...lease ensure you wear pro tective goggles gloves headgear and suitable footwear when assembling and glazing the building 2 Please remember that glass is fragile and should be handled with extreme care Always clear up and dispose of any breakages immediately 3 Do not assemble the greenhouse in high winds 4 For safety reasons and ease of assembly we recommend that this greenhouse is assembled by a m...

Страница 3: ...onsiderations 1 Please bear in mind that assembling your greenhouse can be time consuming You may need to spread the construction over two or more days We recommend that you avoid leaving the building partially glazed If you ever have to leave your greenhouse half assembled and not anchored down weigh it down with slabs or bags of sand to stop the wind moving it 2 You will find it helpful to prepa...

Страница 4: ...olution and is our preferred foundation If you use supplier s original base also recommended A brick perimeter base is equally suitable providing there is a concrete foundation beneath it We suggest using a solid brick with no frogs or holes quality stock bricks or semi engineering bricks IMPORTANT Do not anchor your greenhouse down until it is fully assembled including glazing unless you are 100 ...

Страница 5: ... m21 mm 502 502 1826 2436 1826 2436 1808 2418 1600 1705 M6x10 M6 GS 94 2 2 2 4 4 46 46 2 GS 93 1 1 2 2 2 6 4 56 56 2 Side Gable GS010994 GS010993 6901 6901 6902 6903 6901 6901 6904 6905 6907 6908 6909 6611 6611 6811 6811 1 2 3 4 5 6 7 8 9 11 6906 6911 6912 6913 6914 6917 6917 6320 6320 6319 6319 6319 6319 6324 6324 6324 6324 6911 6912 6913 6914 6915 6916 6918 6918 6321 6321 6324 6324 6324 6324 631...

Страница 6: ...6321 6319 6324 6901 6906 6908 6917 6918 6917 6918 6319 6906 6908 6917 6918 6324 6902 6904 6906 6908 6902 6904 m21 6811 6319 Note At this stage if you al ready decide where your vent are positioned please insert two extra bolts into each side bar 6319 either side of a vent opening Side Gable ...

Страница 7: ...1 6319 6324 6321 a1 a2 6960 mm 2446 2436 1600 1705 2418 M6x10 M6 383 QTY 1 1 3 2 1 25 25 3 6811 1 2 3 4 6316 6319 6319 6319 6321 6324 6324 1 2 6811 6319 6324 6321 6324 3 6321 6319 4 6319 6316 Rear wall Package 2 ...

Страница 8: ...8 5 6 7 5 6811 6 7 6901 6321 6901 Rear wall 8 8 8 8 6319 6960 6316 6928 6929 ...

Страница 9: ...432 183 347 1991 5 606 2436 M6x10 M6 2 5M GS 94 1 2 1 3 2 2 1 26 26 1 GS 93 1 2 1 3 2 2 1 26 26 1 GS010994 GS010993 6801 1 6922 6922 6926 6926 6923 6930 2 4 5 6 8 7 9 6924 6924 6927 6801 6922 6922 6926 6927 6927 6926 6923 6930 6925 6925 6925 6927 3 Front wall Package 3 ...

Страница 10: ...6903 6905 6927 6927 6926 6927 6922 6923 6926 6923 6922 6924 6925 6930 6924 6925 6930 6930 6903 6905 Front wall Please insert fluff into the channel of ridge bar 6930 before it connect to side corner bar 6903 6905 and roof corner bar 6906 6908 6903 6905 ...

Страница 11: ...M6 478 272 GS 94 3 1 2 34 34 3 GS 93 3 1 3 44 44 3 GS010994 GS010993 6928 6928 6928 6929 6929 6929 6931 6931 6331 6331 6331 6331 6331 1 2 3 4 5 6 1 2 3 4 5 6 6928 6929 6319 6316 6928 6929 6930 6931 6906 6908 6928 6929 6931 6906 6908 6331 6331 6928 6929 Package 4 7 6961 6962 ...

Страница 12: ...36 6039 6337 6041 6055 a1 a2 a7 a10 mm 626 611 600 700 626 200 M6x10 M6 M4x8 M4 QTY 1 1 1 2 1 1 8 8 2 2 GS 94 GS 93 Vent No 2 2 6336 6337 6337 H 1 2 3 1 6337 6336 6039 6055 6039 6055 a10 a7 6039 3 6039 6337 Package 5 ...

Страница 13: ...op bar 6336 into vent ridge bar 6936 first before locating vent system in posi tion Maybe you should swing vent ridge bar 6936 to match the extra bolt in side bar 6319 which inserted in ad vance At the time the vent should be opened otherwise it will block vent ridge bar to swing to position ...

Страница 14: ...1 p10 mm Φ3 5x19 Φ3 5x35 M4x8 3 8M M3x10 M3 1000 QTY 4 20 4 4 1 4 4 1 1 6938 6938 6940 6940 6941 6942 6939 6939 6939 6939 6939 6939 1 2 3 4 5 1 2 3 4 5 6940 6940 6938 n1 a7 a6 6939 6940 6940 6939 a6 a6 p4 6941 6942 a12 a11 m11 a11 a12 m11 Package 6 m11 is magnetic door lock every center door vertical bar assemble half part p4 is plastic door glider ...

Страница 15: ...6923 6923 6937 6937 a5 p5 p4 6801 Bracket m22 was used to connect door track bar 6937 and corner bars Please assemble bracket m22 on door track bar 6937 first before connect ing door track bar to horizontal bar 6923 p5 is door track cover and door stop ...

Страница 16: ... same with bottom sill Please note that the handle is on the right hand side The diagrams are viewed from inside Use cropped head both to attach the louvre to the frame during the glazing of the greenhouse Glass pane could be slided into louver holders on both sides directly Polycarbonate pane should be slided into louver holders together with alu Cover strips on both edges Bend the aluminium ends...

Страница 17: ... H Please cut 20mm long rubber gib part p10 to fill in the gap between glass and aluminium frame from greenhouse inside 4 gibs every glass panel at 4 corners One meter long rubber gib in Door Package I I I I I ...

Страница 18: ... On front and rear gable and side wall Please put foam together with masking paper on glazing bar first then peel off masking pa per from foam before assembling glass panels GS010994 GS010993 FOAM 10M 5 roll 6 roll ...

Страница 19: ...ze GS 94 GS 93 A 598x16 176 2 2 B 598x180 340 2 2 C 598x343 503 2 2 D 598x506 666 2 E 598x949 4 4 F 598x798 16 20 G 598x835 2 2 Size GS 94 GS 93 H 594x710 2 2 I 589x605 6 6 J 598x181 4 K 598x345 3 Louver 561x100 3 580 10 12 GS010994 GS010993 K K J J J F F F E E F F F F F F F F E E F F F F F F F F F F ...

Страница 20: ... 1901 B A c 332 c 175 c 168 Glass Use PVC Bar Capping E E E E F F F F F F F F F F F F G H A B C c 485 c 338 c 830 c 830 c 1598 c 1598 c 1598 c 1598 c 1598 c 1598 c 1598 c 1598 c 1598 c 1598 c 1598 c 1598 B C D A F F F F F F F F F F F F F F H G c 1598 c 1598 c 1598 c 1598 c 1598 c 1598 c 1598 c 1598 c 1598 c 1598 c 1598 c 1598 c 1598 c 1598 c 830 c 830 c 649 c 502 c c 338 DWG Length GS 94 GS 93 Fro...

Страница 21: ...G Length GS 94 GS 93 Roof c 1276 8 8 948 8 1580 8 GS010994 GS010993 Panel Panel Panel Note PVC capping bars were pushed in place from both top and bottom in diagonal direction to gether If you assemble it from one side by one side you will fell space is too tight to assemble another PVC capping bar Step1 1 Step3 3 Step5 5 2 Step2 4 Step4 6 Step6 PVC Capping Bar ...

Страница 22: ...22 P8 P9 M0 P1 P0 P2 mm 1000 200 QTY 1 1 1 1 1 1 Attach Clip P9 P8 P0 P0 P1 P2 P1 Downpipe kit ...

Страница 23: ...The list of parts Description GS010994 GS010993 1 Side 1 1 2 Rear 1 1 3 Front 1 1 4 Roof 1 1 5 Vent 2 2 6 Door 1 1 7 Louver 1 8 Polycarbonate panels or Glass 1 1 9 Tools 1 1 10 Assembly Instruction 1 1 ...

Отзывы: