
11
Electrical connections
3.8 Voltage Pulse Connection to family instruments
Flow instruments or a
terminal box can be
directly mounted to the
Insertion Meter using kits
Note
:
For other output styles see
receiving instrument manual
The Insertion Meter cable
should not be run with other
high energy cables
( clause 3.3 ).
yellow
Screen
Screen
yellow
green
6
5
4
3
2
1
7
-0V (ground)
8
9
10
11
12
13
14
DIP switches
all in the
OFF position
3
2
1
O
N
RATE TOTALISER
& ECOBATCH
INSTRUMENTS
1 2 3
DIP switches 2 & 3
to be in the OFF
position
ON
green
+Vdc +∏ -gnd
4
5
6
BT11 BATTERY
TOTALISER
gnd
+ -
1
2
3
RATE
TOTALISER
RESET
>
PROGRAM
ENTER
gal
RUN ACCUM. TOTAL
STOP BAT LOW
RATE
TOTAL
ACCUM
TOTAL
^
LOCK
LOCK
Содержание 490
Страница 1: ...INSTRUCTION MANUAL BI DIRECTIONAL INSERTION METER LOCK ...
Страница 18: ...NOTES ...
Страница 19: ...NOTES ...