OPERATING INSTRUCTIONS
9
The corner of the film can be cut at an angle to
make it easier to fit the film over the air nozzle.
Operating setting details
1.
Temperature setting is on the left side of panel.
Pressing the “+” button increases the temperature; pressing the “-” button
decreases.
There are 1-30 levels.
Press one time means increase or decrease 1 level. Continuous pressing rapidly
increases or decreases. (Please decrease if there are holes in the sealing bags;
please increase if sealing is not very strong)
2.
Air volume setting is on the right side of panel.
Pressing the “+” button increases the air volume; pressing the “-” button
decreases. There are 1-40 levels.
Press one time means increase or decrease 1 level. (Please decrease the air
volume if there is air in the film on the left side of film tension)
3.
Working time presetting:
Long press the “STOP” button to enter the run time preset mode (00:01~02:00),
the temperature “+” and “-” buttons refer to hours; the air volume “+” and “-
”buttons refer to minutes.
Please press the “STOP” button to save and exit the data.
1.
Before presetting run time, please estimate the rest length of film to avoid the
long-time racing and cause the machine breaking.
A whole roll film (300 meter) needs 1 hour and 20 minutes; half roll film can
preset 30 minutes running time; less half roll film can preset 10~20 minutes.
2.
The working time only be set up in advance and can not be changed while the
machine in working mode. But the air volume and temperature can be
changed anytime.
3.
Users can adjust the parameter according to different required; it will save the
used parameter when each power off.
Содержание AirBoy Nano3
Страница 1: ...nano3 OPERATING INSTRUCTIONS...