1. Raise the lift up to confirm operation of upper limit switch.  Approach the

upper limit switch cautiously by pressing the UP button in short bursts as you
near the top of the lift travel.  A properly working limit switch will stop the lift
before the ball screw reaches its limit of travel.  If the limit switch does not stop

the lift and the ball nut reaches the end of the ball screw you will be able to see
the drive unit twisting slightly, indicating that the motor is trying to run.  Also,
you probably would have heard the ball nut hitting the metal stop at the end of
the screw.  The brake will still click when stopped at the limits.

2.  Lower the lift down to confirm operation of lower limit switch.  Again, as you
approach the bottom of the lift travel press the DOWN button in short bursts.
The lift should stop with a small amount of slack in the lifting cable after the
cable contacts the lift frame.  If the limit switch does not stop the lift and the ball

nut reaches the end of the ball screw you will be able to see the drive unit

twisting slightly indicating that the motor is trying to run.  Also, you probably
would have heard the ball nut hitting the metal stop at the end of the screw.

Prior to installing your lift please follow this check list to

confirm proper operation.

If either limit switch does not stop the lift correctly, contact
FLOE customer service and do not use the lift until the
problem is corrected.

3.  Listen for unusual noises during lift operation.  Squeaking may indicate that

the lift may not have been greased.  Both the thrust bearing and the ball nut

MUST be greased before using the lift.  Please see owners' manual for details.

4.  If you have a wireless remote it would be good idea to test it at this time.
There is no need to go all the way to the limit switches since those were tested
above.  Also check the inside (amber) light and the mast light if you have one.
The lights come on when their buttons are pressed and go off with a second

press or after about 7 minutes of no light button activity.

2.

Connect the 32" white battery interconnect wire to

the negative post of the first battery and the positive

post of the other battery.

See diagram below.  Place the covers on the battery

boxes and strap it through the slots on the battery

tray.

Battery Interconnect Wire (32" White)

Black Wire

To Drive
   Train

1.

Connect the red wire from the ASC to the positive

post of one battery.  Connect the black wire from the

ASC to the negative post of the other battery.

Red Wire

VSD-6500 Boat Lift  (DC ONLY)

24 Volt Battery Connection Diagram

The drive train can now be connected to the power
source. It is very important that this connection be

made in accordance with State and Local Regulations.

SEE WARNING:

Step 8  (AC ONLY)

Содержание VSD6500

Страница 1: ......

Страница 2: ......

Страница 3: ...1 32 32 32 32 33 33 33 34 34 34 34 35 41 42 44 44 43 43 45 45 46 46 47 49 49 49 71 54 54 55 55 55 55 56 57 57 58 58 58 58 79 59 73 60 60 60 61 61 61 61 61 63 64 65 69 65 66 66 66 69 68 68 66 69 69 69...

Страница 4: ...OF 12 68 35 68 42 65 87 69 86 85 72 72 91 90 89 72 93 72 93 72 95 94 78 92 56 67 52 78 IMPORTANT VERIFY THAT THE LIFTING CABLE IS POSITIONED OVER THE TOP OF THE BALL SCREW SUPPORT BOLT VSD 6500 Frame...

Страница 5: ...bs See Fig 1A Arrange corner posts as shown to the right and in Fig 1A thru Fig 1E 1 2 x 5 Bolt 1 2 Aluminum Nylock Nut Fig 1B Fig 1D Fig 1E Fig 1A Fig 1A Fig 1B Fig 1C Fig 1D Fig 1E Right Front Corne...

Страница 6: ...e just installed 3 8 bolts to 35 ft lbs 1 2 bolts to 80 ft lbs Grease Hole 3 8 x 4 1 2 Attach the ball screw clamp to the corner post using 2 3 8 x 6 bolts and 2 nylock nuts torque to 35 ft lbs as sho...

Страница 7: ...x 3 3 4 bolts and nylock nuts as shown in Fig 3C Male V brace Clamp Female V brace Clamp 3 8 x 3 1 2 Bolts 3 8 Nylock Nuts Fig 3B Fig 3B V Braces Upper Clamp Upper Clamp At this time you may have to...

Страница 8: ...m to the assemblied side frames using 4 1 2 x 4 bolts 8 flat washers and 4 nylock nuts See Fig 4A The front frame beam is attached the same as the rear but use 2 1 2 x 4 bolts in the top holes only Se...

Страница 9: ...5D Place the left right cradle beams on top of the frame beams with the top cable holes to the rear Special attention should be taken to insure that the cable ends are in the right location and a 1 4...

Страница 10: ...a 1 2 x 2 1 4 bolt and nylock nut as shown in Fig 6E Torque both bolts to 80 ft lbs Locate the cable holder and 4 sheave on the hardware card Wrap the cable around sheave and attach to the clamp with...

Страница 11: ......

Страница 12: ...check list to confirm proper operation If either limit switch does not stop the lift correctly contact FLOE customer service and do not use the lift until the problem is corrected 3 Listen for unusua...

Отзывы: