You will require the following tools to complete installation of the bladder/s: 

1.

 

Tape measure; 

2.

 

Spirit level; 

3.

 

Shovel or spade for levelling and creating trenches for inlet and outlets; 

4.

 

Saws for cutting and additional PVC piping that will be required; 

5.

 

Power drill with ratchet screw driver for tightening hose clamps etc.; and, 

6.

 

Wrenches to tighten threaded fittings 100mm & 32mm in size. 

MAINTENANCE: 

Regularly check the site where the bladder is installed to ensure nothing is rubbing against it, and that there is nothing sharp around the bladders.  The 
filters supplied need to be maintained – see the manufactures instructions for further information.  We also recommend that you use the stored water as 
much as possible – this will help keep the water supply fresh and help to increase the life of the material, thus increasing the lifespan of the bladder.  Any 
repairs etc. need to be reported to FloatPac within seven days of any damage being noticed.  Small puncture holes can be easily repaired onsite, although 
any larger damage will need to be assessed by FloatPac at our manufacturing plant in Springvale, Victoria. 

 

 

 

 

 

 

 

 

 

 

Содержание RainPac

Страница 1: ...P a g e 1 15 UNDER HOUSE AND DECKING FLEXIBLE RAINWATER HARVESTING BLADDER TANKS INSTALLATION GUIDE MANUFACTURED BY FLOATPAC PTY LTD...

Страница 2: ...use hot water to clean your RainPacTM DO NOT use high pressure water cleaners on any part of the RainPacTM DO NOT use any other cleaning agent or solvent to clean your RainPacTM at any stage DO NOT c...

Страница 3: ...ra Rain Head 1 x 90mm Tank Overflow Flap Valve Mozzie Stoppa 2 x 90mm PVC tee 1 x 1 metre x 90mm PVC pipe 1 x pipe cement kit 1 x 32mm ball valve for outlets 1 x 1 metre x 32mm flexible outlet hose wi...

Страница 4: ...talled to ensure nothing is rubbing against it and that there is nothing sharp around the bladders The filters supplied need to be maintained see the manufactures instructions for further information...

Страница 5: ...715mm Installation of the overflow system above these height restrictions will mean the RainPacTM will overfill and this will void the warranty If you do not have enough height as per the guide above...

Страница 6: ...see is the end where all the fittings are This is the end that is closest to the downpipe s The RainPacTM has been rolled the correct way so you can simply remove it from the box and lay out flat Plea...

Страница 7: ...CKET 1 X 100MM MBSP F SOCKET 1 X 100MM 90MM ADAPTOR 1 X 90MM M F 90 DEGREE ELBOW 1 X 90MM M M 90 DEGREE ELBOW 1 X 90MM X 500MM SUGGESTED LENGTH STORMWATER PIPE IMPORTANT DO NOT USE THE INLET FITTING L...

Страница 8: ...P a g e 8 15 INLET SETUP...

Страница 9: ...FITTINGS REQUIRED FROM FITTING KIT 1 X 32MM THREADED BALL VALVE 1 X 32MM BLACK POND HOSE WITH M BSP ENDS PLEASE NOTE THE M BSP FITTINGS HAVE ALREADY BEEN FITTED TO THE 32MM FLEXIBLE BLACK POND HOSE I...

Страница 10: ...P a g e 10 15 OUTLET SETUP...

Страница 11: ...X LEAF EATERTM ULTRA 1 X 90MM M F ELBOW 2 X 90MM TEE PIECE F F F 90MM PIPE TO SUIT IMPORTANT THE SET HEIGHT OF THE OVERFLOW MUST SUIT THE LISTED HEIGHTS BELOW FOR THE WIDTH OF THE RAINPACTM BEING INS...

Страница 12: ...P a g e 12 15 OVERFLOW SETUP HORIZONTAL DOWNPIPE...

Страница 13: ...P a g e 13 15 OVERFLOW SETUP VERTICAL DOWNPIPE...

Страница 14: ...P a g e 14 15 RENDERINGS OVERFLOW SETUP HORIZONTAL DOWNPIPE OVERFLOW SETUP VERTICAL DOWNPIPE...

Страница 15: ...ainPacTM is a trademark of FloatPac Pty Ltd Postal PO BOX 372 Springvale Victoria Australia 3171 Physical 11 Awun Court Springvale Victoria Australia 3171 Phone 1300 306 000 61 0 3 9548 4700 sales rai...

Страница 16: ...o event shall FloatPac Pty Ltd be liable for the cost of labour expended by any person or entity other than FloatPac Pty Ltd or its agent on any defective workmanship with respect to the installation...