![FLIR ThermaCAM P45 Скачать руководство пользователя страница 51](http://html1.mh-extra.com/html/flir/thermacam-p45/thermacam-p45_user-manual_2306337051.webp)
7.6
Disturbance factors at thermographic inspection of
electrical installations
During thermographic inspections of different types of electrical installations, distur-
bance factors such as wind, distance to object, rain or snow often influence the
measurement result.
7.6.1
Wind
During outdoor inspection, the cooling effect of the wind should be taken into account.
An overheating measured at a wind velocity of 5 m/s (10 knots) will be approximately
twice as high at 1 m/s (2 knots). An excess temperature measured at 8 m/s (16 knots)
will be 2.5 times as high at 1 m/s (2 knots). This correction factor, which is based on
empirical measurements, is usually applicable up to 8 m/s (16 knots).
There are, however, cases when you have to inspect even if the wind is stronger than
8 m/s (16 knots). There are many windy places in the world, islands, mountains, and
so on but it is important to know that overheated components found would have
shown a considerably higher temperature at a lower wind speed. The empirical cor-
rection factor can be listed.
Correction factor
Wind speed (knots)
Wind speed (m/s)
1
2
1
1.36
4
2
1.64
6
3
1.86
8
4
2.06
10
5
2.23
12
6
2.40
14
7
2.54
16
8
The measured overheating multiplied by the correction factor gives the excess tem-
perature with no wind, that is, at 1 m/s (2 knots).
7.6.2
Rain and snow
Rain and snow also have a cooling effect on electrical equipment. Thermographic
measurement can still be conducted with satisfactory results during light snowfall
with dry snow and light drizzle, respectively. The image quality will deteriorate in heavy
7
Publ. No. 1557966 Rev. a155 – ENGLISH (EN) – February 6, 2006
35
7 – Introduction to thermographic inspections of electrical installations
Содержание ThermaCAM P45
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 7: ...ThermaCAM P45 User s manual Publ No 1557966 Rev a155 ENGLISH EN February 6 2006...
Страница 10: ...Reg No Status Designation 29 233 400 Pending U S x Publ No 1557966 Rev a155 ENGLISH EN February 6 2006...
Страница 16: ...xvi Publ No 1557966 Rev a155 ENGLISH EN February 6 2006...
Страница 18: ...INTENTIONALLY LEFT BLANK 1 2 Publ No 1557966 Rev a155 ENGLISH EN February 6 2006 1 Warnings cautions...
Страница 28: ...INTENTIONALLY LEFT BLANK 4 12 Publ No 1557966 Rev a155 ENGLISH EN February 6 2006 4 Packing list...
Страница 116: ...INTENTIONALLY LEFT BLANK 10 100 Publ No 1557966 Rev a155 ENGLISH EN February 6 2006 10 Camera program...
Страница 118: ...INTENTIONALLY LEFT BLANK 11 102 Publ No 1557966 Rev a155 ENGLISH EN February 6 2006 11 Folder and file structure...
Страница 124: ...INTENTIONALLY LEFT BLANK 12 108 Publ No 1557966 Rev a155 ENGLISH EN February 6 2006 12 Electrical power system...
Страница 128: ...INTENTIONALLY LEFT BLANK 14 112 Publ No 1557966 Rev a155 ENGLISH EN February 6 2006 14 Maintenance cleaning...
Страница 180: ...INTENTIONALLY LEFT BLANK 20 164 Publ No 1557966 Rev a155 ENGLISH EN February 6 2006 20 Theory of thermography...
Страница 214: ...198 Publ No 1557966 Rev a155 ENGLISH EN February 6 2006...
Страница 215: ......