Understanding the LCT-11 Test results: 

 

Test result with LCT-11 

 

Possible reasons 

 

What to do? 

 

Input / Output resistance not in the 
expected range  

Cable or connector problem  

Check the cable integrity and the 
connectors  

Problems inside the load cell  

Replace the load cell  

Sense is too high (6-wire load cell)  

Excitation and Sense not connected 
inside the load cell or 4-wire load cell was 
tested as a 6-wire type 

Replace the load cell  

Signal output from the scale is not in 
the expected range 

Corrosion, force shunts, accumulated 
dust below the load cell or a faulty load 
cell, dirty or humid junction box 

Clean the dust and check for force 
shunts and alignment. Replace the 
load cell if necessary 

Signal output of the unloaded scale is 
not in the expected range (target 
value according to the scale’s dead 
load) 

One or more load cells are damaged due 
to a mechanical shock or overload  

Replace the load cells 

Insulation resistance (Body to bridge / 
Shield to bridge) is too low  

Insulation error due to water or chemical 
ingress to the cable or into the load cell  

Replace the cable and / or the load 
cell  

 

Special Instructions for Measuring the Insulation Resistance on a Load Cell

:  

1.  Measuring the insulation resistance on a load cell requires special care and cleanness. Small errors when 

executing the tests may lead to wrong results. 

2.  The ambient conditions must be dry, clean, dust-free and free from grease. The underlay has to be of non-

conductive material. Electrostatic charges will influence the measurement result. 

3.  The input connector has to be dry, clean and corrosion-free. Please take care for the correct fit. The cable of 

the load cell has to be absolutely dry and clean. If required dry and clean it. If necessary make a clean strip of 
the cable end. 

4.  Connect the wires of the load cell cable to the correct pins of the input connector, but make sure that the 

SCREEN and the BODY are NOT connected. 

5. 

Please don’t touch and move the cable during the measurement. 

6.  During the measurement the operator should be the only person within a 1 m distance from the test stand. 

When the instrument is measuring he should not move. 

7.  Power on the instrument. Then press the <

On/Off

> and the 

<

keys simultaneously for approx. 2 seconds. 

This will start a measurement for the connected cable. 

8.  Connect the SCREEN and the BODY (of the load cell) to the input connector and subsequently start a load 

cell test cycle. 

9.  Generally verify the repeatability of the measurement results. 

 

 

Battery information 

Please note that if the device is not used for a longer period (we recommend 3 days), the batteries must be 
removed from the LCT-11. If the batteries leak, they may damage the device 