background image

MSB Flintec

  26 November 2014

Contents

1.

Introduction & Weighing system overview

2.

Accuracy, Performance & Applications

3 - 4. 

Installation styles

4.

Cable orientation

5.

Preparation

6 - 10.  Body - Chassis Alignment & Installation

11.

Welding procedure

12.

Torque values and fixing selection

13.

Installation examples, axle, side body-rail mount

14.

Technical specification and dimensions

15.

Cable, connectors and cable installation

16.

Routine maintenance & Installation check list

Содержание DSB7-15T

Страница 1: ...ations should be carried out by suitable qualified engineers Pleasereadthismanualcarefully Chassis body mounted on board weighing load cells Trucks Agricultural Machines and Axle Weighbridges DSB7 7 5...

Страница 2: ...ion styles 4 Cable orientation 5 Preparation 6 10 Body Chassis Alignment Installation 11 Welding procedure 12 Torque values and fixing selection 13 Installation examples axle side body rail mount 14 T...

Страница 3: ...ld cause a hazardous operating condition Upon completion of the load cell installation you or an appropriately trained service engineer will need to install a weighing indicator and calibrate the syst...

Страница 4: ...ttach the superstructure to the chassis this will result in an alternate load path that will degrade weighing system accuracy Typical applications include waste trucks tippers tankers flatbeds and van...

Страница 5: ...perstructure frame member Mounting angles provides additional strength Spreader cover plate 3 Top welded mounting bracket Bottom welded on mounting bracket Top bolted mounting bracket In line mounted...

Страница 6: ...y have limited access for inboard facing cable exit For this reason inboard facing cabling is usually used only with in line mounted load cells Connector protection Flintec recommends that a protectiv...

Страница 7: ...ensure that the modified structure is strong enough to prevent not only permanent elastic bending so that upper structural elements will not contact lower elements and create an alternative load path...

Страница 8: ...Structure Optimum performance of DSB7 is dependent upon a solid mounting base for the load cells Steel brackets of heavy construction are required Since this is a thicker section than usually found on...

Страница 9: ...e regardless of road condition Frame Rail Inspection Inspect the frame rails to ensure they are clean straight and free of cracks corrosion pitting burrs or any other imperfections that may affect the...

Страница 10: ...t deeper than 25 mm Attach the mounting angle bracket using BS ISO DIN Grade 10 9 SAE Grade 8 quality bolts Grade C lock nuts and a hardened washer under each lock nut The bolts must have a diameter o...

Страница 11: ...eld upper mounting bracket securely to the superstructure using a low hydrogen process and AWS E7018 rod or equivalent DO NOT WELD BEARING PLATES YET See CAUTION on page 10 before proceeding with weld...

Страница 12: ...lectrical current flow through the load cell attach ground strap directly to the structure on the same side of the load cell on which welding is being done Complete the attachment of the superstructur...

Страница 13: ...all be avoided The preheat temperature shall be a MINIMUM of 20 C 68 F and a MAXIMUM of 65 C 150 F Cleaning Before Welding Bracket components and bearing plates shall be visually inspected to verify t...

Страница 14: ...ded M16 1 5 fine 12 9 350 380 Nm High dynamic loads DSB7 15 t 33000 Lbs Top and end bolts M24 2 fine 10 9 1000 1100 Nm Recommended M24 2 fine 12 9 1200 1300 Nm High dynamic loads 12 Socket Head Cap Sc...

Страница 15: ...e l Welded ribs l Load cell inverted l In line l Top spacer l Welded ribs l Outboard l No spacers l Bolted to body l Load cell inverted l In line l No spacers l Welded to body l Load cell inverted l P...

Страница 16: ...lly Y2 X Y Y1 Z Z1 D L3 L3 L2 L1 C1 C2 H 4 x T1 Optional spacer D D Specifications DSB7 7 5 t DSB7 15 t Rated 0utput RO 2 0 mV V 1 at 7 5t 2 0 mV V 1 at 15 t Zero balance 0 2 RO or better Combined err...

Страница 17: ...or cable sockets Extender cables Junction box to indicator cabeles On board weighing load cells and extensometers have 5 meter cable complete with moulded 4 pin M12 MALE cable as standard Male Female...

Страница 18: ...cables are routed and secured in protected areas of the frame Indicator installation see Indicator Operators Manual System calibration see Indicator Operators Manual Routine Maintenance To ensure you...