FLEXPOWER TWO VFXR Series Скачать руководство пользователя страница 4

Neutral

Ground

AC IN

MA

T

E

R

T

S

CB

3

CB

2

CB

1

CB6

CB5

CB

4

CB8

CB7

CB1

0

CB9

CB1

2

CB1

1

CB1

4

CB1

3

CB1

6

CB1

5

GND

I/ON

I/ON

I/ON

I/ON

I/ON

I/ON

NORMAL 

UP

DOWN 

BYPASSE

D

O/OFF

O/O

FF

GND

DC 

NEGATIVE 

SHUNT A

SHUNT C

SHUNT B

AC IN

DC

AC OUT

AC IN

DC

AC OUT

MA

T

E

R

T

S

AC HOT OUT

AC NEUTRAL OUT

CHASSIS GROUND/PE

CHASSIS GROUND/PE

AC NEUTRAL IN

AC HOT IN

MA

T

E

R

T

S

AC HOT OUT

AC NEUTRAL OUT

CHASSIS GROUND/PE

CHASSIS GROUND/PE

AC NEUTRAL IN

AC HOT IN

MASTER  BYPASS

SL

A

V

E L2 

BYPASS

MASTER  OU

T

P

UT

SL

A

V

E L2 

O

U

TPU

T

MASTER  IN

P

U

T

SL

A

V

E L2 

IN

P

U

T

250

ON

250

ON

OFF

O

SLAVE L2

INVERTER

MASTER

INVERTER

FNDC

OFF

O

OFF

O

Charge 

Controller

OFF

O

O

F

F

O

FAULT

PV 

INACTIVE

NORMAL

PV ACTIVE

PV ARRAY

GROUND 

FAULT

DETECTOR 

INTERRUPTER

GROUND 

FAULT

PV 

ARRAY

General Wiring

O

I

O

I

O

I

O

I

O

I

O

I

O

I

O

I

O

I

O

I

O

I

O

I

AC 

Source 

Ground Electrode 

System (Ground Rod)

900-0158-01-0

0

 REV 

B

.vsd

©2013 OutBack Power Technologies.  All Rights Reserved.

PV Array #1

Battery Bank

Vented Battery Enclosure

AC 

Distribution Panel

PV Array #2

PV Combiner Box

Charge 

Controller #1

Charge 

Controller #2

DC 

POSITIVE 

Negative

Positive

Ground

DC 

LEGEND

IMPORTANT:

  

Example only.  

Actual wiring may vary depending on local 

electric code.  Factory wiring is not shown.

Master 

Inverter

Slave 

Inverter

Charge 

Controller

MATE3

Ground 

Electrode 

Conductor

RTS

CAT5 

Cable

PV 

ARRAY

AC IN

NEUTRAL

GROUND

AC Subpanel

Loads

(230 Vac)

 

L1

N

N

Neutral

HOT L1

Ground

AC LEGEND

L1

N

L1

AC IN

AC OUT

AC 

OUT

AC OUT

Содержание TWO VFXR Series

Страница 1: ... 2 Enable N Weekday Use 0 00 Drop 0 00 Back Continue Wizard Grid Use Schedule Period 3 Enable N Weekday Use 0 00 Drop 0 00 Back Continue Wizard Battery Monitor Shunt B Connection Charge Controller Back Continue Wizard Grid Use Schedule Period 3 Enable N Weekday Use 0 00 Drop 0 00 Back Continue Wizard High Battery Transfer Mode Disabled Grid Connect 48 0 VDC Delay 60 Min Grid Disconnect 52 0 VDC De...

Страница 2: ...verter Chassis Ground DC Positive Plate 17 18 19 Charge Controller Chassis Ground 20 DC Negative Plate 17 18 19 19 20 20 Surge Protector CC Communication Ports 21 22 23 FN DC Communication Port 24 Inverter Communication Ports 21 21 22 22 23 23 24 FP2 Mounting 1 Ensure the mounting surface is strong enough to handle 3 times the total weight of all the components 2 Using additional people to assist ...

Страница 3: ... breakers 2 Turn off open the DC circuit breakers for the battery Wait 5 minutes for the devices to internally discharge themselves 3 Turn off open the PV circuit breakers 4 Turn off open the GFDI circuit breaker 5 Verify 0 Vdc on the DC input terminal of the master inverter by placing the voltmeter leads on and 6 Verify 0 Vdc on the DC input terminal of the slave inverter by placing the voltmeter...

Страница 4: ... OFF O O F F O FAULT PV INACTIVE NORMAL PV ACTIVE PV ARRAY GROUND FAULT DETECTOR INTERRUPTER GROUND FAULT PV ARRAY General Wiring O I O I O I O I O I O I O I O I O I O I O I O I AC Source Ground Electrode System Ground Rod 900 0158 01 00 REV B vsd 2013 OutBack Power Technologies All Rights Reserved PV Array 1 Battery Bank Vented Battery Enclosure AC Distribution Panel PV Array 2 PV Combiner Box Ch...

Отзывы: