FLEXPOWER TWO VFXR Series Скачать руководство пользователя страница 3

MA

T

E

R

T

S

CB

3

CB

2

CB

1

CB

6

CB

5

CB

4

CB

8

CB

7

CB

10

CB

9

CB

12

CB

11

CB

14

CB

13

CB

16

CB

15

GND

AC IN

DC 

POSITIV

I/ON I/ON

I/ON

I/ON

I/ON

I/ON

NORMAL 

UP

DOWN 

BYPASSED

O/

OFF

O/

OFF

GND

DC 

NEGATIVE 

SHUNT A

SHUNT C

SHUNT B

AC IN

DC

AC OUT

AC IN

DC

AC 

OUT

MA

T

E

R

T

S

AC HOT OUT

AC NEUTRAL OUT

CHASSIS GROUND/

PE

CHASSIS GROUND/

PE

AC NEUTRAL IN

AC HOT IN

MA

T

E

R

T

S

AC HOT OUT

AC NEUTRAL OUT

CHASSIS GROUND/

PE

CHASSIS GROUND/

PE

AC NEUTRAL IN

AC HOT IN

MASTER  BYPASS

SL

A

V

E L2 

BYPASS

MASTER  OU

T

P

UT

SL

A

V

L2 

OU

T

P

UT

MASTER  IN

P

U

T

SL

A

V

L2

 

IN

P

U

T

250

ON

250

ON

OFF

O

SLAVE L2

INVERTER

MASTER

INVERTER

PV 

ARRA

Y

PV 

ARRA

Y

FNDC

OFF

O

OFF

O

GROUND 

FAULT

Charge 

Controlle

r

Charge 

Controller

OFF

O

O

F

F

O

FAULT

PV 

INACTIVE

NORMAL

PV ACTIVE

PV ARRAY

GROUND 

FAULT

DETECTOR 

INTERRUPTE

R

Energize/Startup 

Procedures

Pre-startup Procedures:

After opening the AC and DC enclosures:

1.

Double-check all wiring connections.

2.

Inspect the enclosure to ensure no tools 
or debris has been left inside.

3.

Disconnect AC loads at the load panel.

4.

Disconnect AC inputs at the source.

5. 

Place the mechanical interlock in the 
normal (non-bypass) position.

Functional Test 

Points

Battery Voltage Test Points

AC IN Voltage Test Points 

(Terminal bus bar = TBB)

AC OUT Voltage Test Points

 

(Terminal bus bar = TBB)

De-energize/Shutdown 

Procedures

WARNING:  Lethal Voltage

Review the system configuration to identify 
all possible sources of energy.  Ensure ALL 
sources of power are disconnected before 
performing any installation or maintenance 
on this equipment.  Confirm that the 
terminals are de-energized using a 
validated voltmeter (rated for a minimum 
1000 Vac and 1000 Vdc) to verify the 
de-energized condition.

WARNING:  Lethal Voltage

The numbered steps will remove power from 
the inverter and charge controllers.  
However, sources of energy may still be 
present in the AC and DC wiring boxes.  To 
ensure absolute safety, disconnect ALL 
power connections at the source. 

WARNING:  Burn Hazard

Internal parts can become hot during 
operation.  Do not remove the cover during 
operation or touch any internal parts.  
Be sure to allow the parts sufficient time to 
cool down before attempting to perform 
any maintenance.  

To de-energize or shut down the OutBack devices:

1.

Turn

 

off

 

(open)

 

the

 

AC

 

circuit

 

breakers.

 

2.

Turn

 

off

 

(open)

 

the

 

DC

 

circuit

 

breakers

 

for

 

the

 

battery.

 

Wait

 

5

 

minutes

 

for

 

the

 

devices

 

to

 

internally

 

discharge

 

themselves.

3.

Turn

 

off

 

(open)

 

the

 

PV

 

circuit

 

breakers.

   

4.

Turn

 

off

 

(open)

 

the

 

GFDI

 

circuit

 

breaker.

5.

Verify

 

0

 

Vdc

 

on

 

the

 

DC

 

input

 

terminal

 

of

 

the

 

master

 

inverter

 

by

 

placing

 

the

 

voltmeter

 

leads

 

on

          

and

          

.

6.

Verify

 

0

 

Vdc

 

on

 

the

 

DC

 

input

 

terminal

 

of

 

the

 

slave

 

inverter

 

by

 

placing

 

the

 

voltmeter

 

leads

 

on

          

and

          

.

7.

Verify

 

0

 

Vdc

 

on

 

the

 

PV

 

terminals

 

of

 

one

 

charge

 

controller

 

by

 

placing

 

the

 

voltmeter

 

leads

 

on

          

and

          

.

8.

Verify

 

0

 

Vdc

 

on

 

the

 

PV

 

terminals

 

of

 

the

 

other

 

charge

 

controller

 

by

 

placing

 

the

 

voltmeter

 

leads

 

on

          

and

          

.

9.

Verify

 

0

 

Vac

 

on

 

the

 

AC

 

output

 

circuit

 

breakers

 

by

 

placing

 

the

 

voltmeter

 

leads

 

on

          

and

          

.

  

900-0158-01-0

0

 REV 

B.

vsd

©2013 OutBack Power Technologies.  All Rights Reserved.

1b

1c

1

1b

1a

1

2

3

4

2

4

2a

2c

5

3

4

2

4

5

3

4

3

3

5

PV Voltage Test Points

1

3

CAUTION: Equipment Damage

Incorrect battery polarity will damage the equipment.

1

1d

1b

1d

2e

2b

2d

2f

Test points 

2a 

and 

2c 

refer to the 

bottom terminal of 

the circuit 

breakers.

1b

1a

1c

1d

2a 2b 2c 2d

2f

2e

1c

2e

2b

2f

2d

2

5

3

To energize or start up the OutBack devices:

1.

Using a digital voltmeter (DVM), verify 12, 24, or 48 Vdc on the DC input terminals by placing 
the DVM leads on       and       .  Confirm that the voltage is correct for the inverter and charge 
controller models.  

Confirm the polarity

.

2.

Verify that the PV output for each charge controller is in the correct range of open-circuit 
voltage and confirm the polarity by: 

a) placing the DVM leads on        and       , and  

b) placing the DVM leads on        and       .  

3.

Verify 230 Vac on the terminals of the AC source and connect the source.  

4.

Verify 230 Vac on the AC Input TBB by placing the DVM leads on        and       .

7.

Turn on (close) the GFDI circuit breaker.

8.

Turn on (close) the PV input circuit breakers.

9.

Turn on (close) the DC circuit breakers from the battery bank to the inverter.   

10. Check the system display or LED indicators.  Ensure the inverter is in the ON state.  

The factory default state for FXR inverters is OFF.  

11. Turn on (close) the FN-DC circuit breaker.

12. Turn on (close) the AC output circuit breakers. 

13. Verify 230 Vac on the AC Output TBB by placing the DVM leads on        and        .

NOTE

:  Assumes correct stacking programming with the Configuration Wizard.

16. Replace the covers on the AC and DC enclosures.

17. Turn on (close) the AC input circuit breakers.  

18. Turn on the AC disconnects at the load panel and test the loads.

4

1b

1a

3

5

3

1

2

3

4

5

2a

2b

2c

2d

Содержание TWO VFXR Series

Страница 1: ... 2 Enable N Weekday Use 0 00 Drop 0 00 Back Continue Wizard Grid Use Schedule Period 3 Enable N Weekday Use 0 00 Drop 0 00 Back Continue Wizard Battery Monitor Shunt B Connection Charge Controller Back Continue Wizard Grid Use Schedule Period 3 Enable N Weekday Use 0 00 Drop 0 00 Back Continue Wizard High Battery Transfer Mode Disabled Grid Connect 48 0 VDC Delay 60 Min Grid Disconnect 52 0 VDC De...

Страница 2: ...verter Chassis Ground DC Positive Plate 17 18 19 Charge Controller Chassis Ground 20 DC Negative Plate 17 18 19 19 20 20 Surge Protector CC Communication Ports 21 22 23 FN DC Communication Port 24 Inverter Communication Ports 21 21 22 22 23 23 24 FP2 Mounting 1 Ensure the mounting surface is strong enough to handle 3 times the total weight of all the components 2 Using additional people to assist ...

Страница 3: ... breakers 2 Turn off open the DC circuit breakers for the battery Wait 5 minutes for the devices to internally discharge themselves 3 Turn off open the PV circuit breakers 4 Turn off open the GFDI circuit breaker 5 Verify 0 Vdc on the DC input terminal of the master inverter by placing the voltmeter leads on and 6 Verify 0 Vdc on the DC input terminal of the slave inverter by placing the voltmeter...

Страница 4: ... OFF O O F F O FAULT PV INACTIVE NORMAL PV ACTIVE PV ARRAY GROUND FAULT DETECTOR INTERRUPTER GROUND FAULT PV ARRAY General Wiring O I O I O I O I O I O I O I O I O I O I O I O I AC Source Ground Electrode System Ground Rod 900 0158 01 00 REV B vsd 2013 OutBack Power Technologies All Rights Reserved PV Array 1 Battery Bank Vented Battery Enclosure AC Distribution Panel PV Array 2 PV Combiner Box Ch...