
07
08
Step 6: Insert Wire Rope
H
H
I
9
5
9
I
H
x8
H
x8
I
M8
Screw Ring
C1
C1
I
9
9
10
Stickers towards the outside
10
x12
C1
I
M6
5
8
8
Step 7: Assemble Wire Grids
Pass the wire rope in the axle (5) through the pulley in the fixed plate (8).
Step 8: Place and Attach Wire Grid
Use nuts (H) and flat washers (H) to fix the wire grids and platform supports (9) to the eyebolt
screw and tighten with M8 socket wrench (I).
Tighten
Tighten
Fine adjustments: move nuts up or
down to make sure the frame is roughly
horizontal and each wire is under equal
tension.
Rough adjustments: make sure the frame
is roughly horizontal and each wire is under
equal tension.
Adjust
Wire
Rope
Unscrew
Adjust the buckle position so each wire is under equal tension while the frame is suspended.
Wooden Ceiling Joists
Wooden Ceiling Joists
Disassemble the J-bolt and nut (C1) as shown below, then use them to attach the wire grids (10)
to the platform supports (9). Then reassemble and tighten the nuts to the J-bolt with M6 socket
wrench (I).