We reserve the right of changing these instructions without special prior notification
3
3. Installation
3.1. Important warnings
•
THE BOILER SHOULD BE PUT INTO
OPERATION BY THE AUTHORIZED SERVICE,
•
THE ENCLOSED IMPURITIES COLLECTOR
SHOULD BE BUILT IN ON THE STARTING LINE
OF CENTRAL HEATING AND INLET COLD
SANITARY WATER,
•
PRIOR TO CONNECTING THE BOILER TO THE
SANITARY WATER LINE, PIPES SHOULD BE
CLEANED IN ORDER TO AVOID THE
BLOCKAGE OF THE EXCHANGER.
THE LIST OF AUTHORIZED SERVICES IS ON THE
BACK OF THE LETTER OF GUARANTEE
THE BOILER SHOULD NOT BE INSTALLED ON
PLACEC WHERE THERE IS A DANGER OF BEING
PORING OVER WITH WATER OR A DANGER OF
SINKING.
IN AREAS WITH STRONG CONCENTRATION OF
LIME IT IS RECOMMENDED TO BUILD IN A
MAGNETIC OR ELECTROMAGNETIC LIME
BREAKER ON THE INLET LINE OF SANITARY
WATER ON THE BOILER.
3.2. Assembly
Minimum distances at assembly
Disassembly schema
T
H
ERMO
-
C
ombi is foreseen for the wall assembly
and for the easier assembly, on the backside
there is foreseen the sus
pension support. For the
suspension
you may use metal wall plugs with the
screw M8 or M10 or stronger plastic wall plugs – diana
screws.
Precise dimensions of boilers are given in the
7.
Technical specification
Filling and emptying valve is delivered together
with the boiler and should be assembled at the
installation.
If possible, the boiler should be assembled to the
lowest point in relation to installation. In this way we
are protecting the boiler from air appearance, which
may leave heaters without water that could result in
their burning through.
THE
GUARANTEE
SHALL
NOT
BE
ACCEPTED
IF
THE
FOLLOWING
WAS
NOT
OBSERVED: