Where: 
F - chimney cross-section (sq m) 
Q - heater thermal capacity (kW) 
h - height of chimney measured from the burner 
level to the exit (m) 
 
It is important for the chimney to start at floor level, 
as the exhaust fumes emerging from the heater 
should have the option of 'bouncing back'. It is also 
important for the lower part of the chimney to have 
an inspection opening that can be sealed tight. 
 
The chimney should stand at least 1.5 metres (five 
feet) above the roof surface. The walls of the 
chimney should be smooth, tight, without any narrow 
passages or turns and free from any other 
connections. A new chimney needs to be dried and 
heated sufficiently before the heater is fired. In case 
of doubt, the technical condition shall be evaluated 
by a chimney specialist. Steel pipe chimneys should 
be taller than masonry chimneys by 15-20%. 
 
Maintenance of the chimney duct within its 
recommended limits is one of the more important 
factors guaranteeing the achievement of appropriate 
technical and operational parameters of the heater.

 

 

NOTE!

 

Due to their high effectiveness, it is 
recommended to use chimney liners made of 
stainless steel thermal heat-resistant steel for 

 

7. Heater operation and maintenance

 

 

7.1. Initial heater start-up

 

 
Before start-up of the heater, inspect as follows: 

 

chimney system tightness 

 

chimney connection correctness 

 

tightness of ventilator contact surfaces and 

inspection openings 

 

manner of connection to the electric grid 

 
The boiler start-up procedure is as follows: 

 

switch on the heater 

 

light up the burner according to this manual 

 

recheck heater tightness 

 

acquaint the user with the operation of the 

unit 

 

note data in the warranty card

 

 
 
 
 
 
 
 

HINT!

 

The conclusion of installation and the 
execution of a heating trial need to be noted in 
the warranty card. The completed warranty 
card should be sent by the user, as copy, to 
the address of the manufacturer so the user is 
registered in the company system.

 

 

7.2. Heater start-up and use (User instructions)

 

 
Before commencing burner start-up, check: 

 

that system ducts are free from 

obstructions 

 

that the ventilation system works 

properly. 

 
1. If this is a repeated start-up, remove the ash 
collected in the loading chamber. The charcoal 
remaining in the chamber can form the first start-up 
layer. 
 
2. Lay out on the remains of the charcoal a layer of 
wood, not filling more than 50% of the grid. 
 
3. From the topside, lay out a layer of minute pieces 
of wood with some bunched-up paper. Afterwards 
add a layer of wood chippings and some pieces of 
soft wood. 
 
4. The heater should be started up by switching the 
control unit on. 
 
5. Light the paper, and after it catches fire, close the 
loading door, leaving it slightly open for a few 
seconds. 
 
6. In order to ease distribution of a higher volume of 
air during start-up, set the volume of primary air by 
extracting and pushing in the ash tray. 
 
7. When the wood catches fire well (after about 20-
30 minutes), fill the chamber with an appropriate 
amount of wood so that the loading chamber is 
approx. 60% full, and close the loading door. 
 
8. The next steps in the burning process entail 
continued supply of fuel and controlling the burning 
process by adjusting the primary air volume by 
extracting and pushing in the ash tray. 
 
9. Never leave the heater unattended!

 

 

NOTE!

 

It is forbidden to disconnect the power supply 
from the device when it is hot, because the 
collected energy can damage the ventilator 
and heat exchanger!

 

 

 
 
 
 

 

the 

FHSPN

 series heaters.

 

Содержание FHSPN 35

Страница 1: ......

Страница 2: ...to the outside environment without any intermediate liquid During combustion smoke and other gases are generated which are ventilated by the chimney line NOTE Due to the specifics of operation of the...

Страница 3: ...at 30 according to the standards indicated above 5 Heater technical data Rated power 35 kW 70 kW Power supply 230 V 50 Hz 400 V 50 Hz Energy consumption 1 2 A 1 6 A Fan air flow 5500 m3 h 12500 m3 h W...

Страница 4: ...rmation of carbon monoxide a safe distance of at least 1 5 metres five feet be maintained from combustible materials during installation and operation of the heater FHSPN series heaters may be stored...

Страница 5: ...d appropriate for the type of work being executed according to the work methods and the physical effort required to carry it out however not being lower than 14 C In working rooms in turn in which lig...

Страница 6: ...NOTE All electric system connections are to be made by an electrician with the appropriate permits NOTE The user is forbidden from any interference or making any changes to the electric connections 6...

Страница 7: ...of the unit note data in the warranty card HINT The conclusion of installation and the execution of a heating trial need to be noted in the warranty card The completed warranty card should be sent by...

Страница 8: ...down and wait out the time necessary for the heat exchanger to cool down NOTE Before commencement of maintenance procedures disconnect the heater power supply NOTE All activities need to be carried ou...

Отзывы: