
12. Attach the Strip Light in Place
Peel the rest of the cover of the 3M tape a few inches at a time while gently pressing the strip to the installation surface. Make
sure the strip is secured on the surface.
13. Complete All Connections
Complete the connections and wiring between your power supply, dimmers, and controllers. For more guidance, refer to the
system diagrams below on how to connect your UltraBright™ Valor Premier Diffusion Series LED Strip Lights to your driver.
14. Turn Power on at Circuit Breaker
Turn on the power. The UltraBright™ Valor Premier Diffusion Series LED Strip Lights should light up and work properly.
05
UltraBright™ Valor Premier Diffusion Series LED Strip Light
Installation Guide