10
Suggested height from
finished floor
Hauteur suggérée à partir
du sol fini
(C)
Drilling guide line
(Upper profile center)
Guide de perçage
(Centre du profil supérieur)
30-36”
A
BASIN SPECIFICATIONS
SPÉCIFICATIONS DU BASSIN
PIPE CENTER
CENTRE DU TUYAU
TEMPORARILY LOCATE VANITY ON THE WALL AND GUIDELINE FOR WALL REINFORCEMENT
PLACER TEMPORAIREMENT LA VANITÉ ET LA LIGNE DIRECTRICE POUR LE RENFORCEMENT
A
C
A
C
BASIN WITHOUT APRON
BASSIN SANS TABLIER
BASIN WITH APRON
BASSIN AVEC TABLIER
7
MODEL
MODÈLE
BASIN HEIGHT
HAUTEUR DU BASSIN
(C)
BASIN WITH APRON
BASSIN AVEC TABLIER
1/2”
12.7 MM
BASIN WITHOUT APRON
BASSIN SANS TABLIER
4”
101.6 MM
SELECT THE DESIRED POSITION OF THE VANITY. THE ADDITION OF (2 X 6) SUPPORT IN THE WALL WILL BE REQUIRED
AS THE UNIT IS HEAVY.
SÉLECTIONNER LA POSITION SOUHAITÉE DU VANITÉ. L’AJOUT DE (2 X 6) SUPPORT DANS LE MUR SERA NÉCESSAIRE
CAR L’UNITÉ EST LOURDE.
ADD BASIN’S HEIGHT “C” TO VERIFY THE FINAL
HEIGHT OF THE VANITY
AJOUTER L’HAUTEUR “C” DU BASSIN POUR
VÉRIFIER L’HAUTEUR FINALE DE LA VANITÉ
EXPOSED WALL STUDS