background image

Product specifications are subject to change without notice   •   

Des changements peuvent être apportés au produit sans préavis. 

Please keep this manual and product code number for future reference 

and for ordering replacement parts if necessary.

Veuillez conserver ce manuel et le code de produit pour des références futures, 

et au besoin, la commande de pièces de rechange.

THANK YOU / 

MERCI

We can assure you that FLEURCO has used the best materials and has applied the strictest quality control measures to 
ensure that each and every unit meets the highest quality standards. This booklet contains general information about the 
unit as well as step-by-step installation instructions. 

Nous pouvons vous assurer que FLEURCO a utilisé les meilleurs matériaux et a appliqué les mesures les plus strictes 

de contrôle de qualité afin de garantir que chaque unité répond aux normes de haute qualité. Cette brochure contient des 

informations générales sur cette unité ainsi que des instructions étape-par-étape pour l’installer.

 BEFORE BEGINNING

 

/

 AVANT DE COMMENCER

Carefully read the instructions before beginning the installation

.

•  It is recommended that you wear safety glasses at all times during the installation

.

•  Observe all local plumbing and building codes.
•  It is strongly recommended that this installation be performed by a professional plumber or contractor.

 

Lire attentivement les instructions avant de débuter l’installation.
• 

Il est recommandé de porter des lunettes de sécurité en tout temps lors de l’installation.

•  Respecter tous les codes de plomberie et de bâtiment locaux.
•  L’installation par un plombier accrédité ou un contracteur est fortement suggérée

Содержание Halo MC04

Страница 1: ...INSTALLATION MANUAL GUIDE D INSTALLATION MC04 01 2020 ...

Страница 2: ... les meilleurs matériaux et a appliqué les mesures les plus strictes de contrôle de qualité afin de garantir que chaque unité répond aux normes de haute qualité Cette brochure contient des informations générales sur cette unité ainsi que des instructions étape par étape pour l installer BEFORE BEGINNING AVANT DE COMMENCER Carefully read the instructions before beginning the installation It is reco...

Страница 3: ...CTOR DÉTECTEUR DE MONTANTS SCREWDRIVER TOURNEVIS LEVEL NIVEAU TAPE MEASURE RUBAN À MESURER CEMENT BOARD SAW SCIE À GYPSE SAFETY GLASSES LUNETTES DE SÉCURITÉ 3 32 DRILL BITS MÈCHE 3 32 7MM 9 32 WRENCH 7MM 9 32 PARTS LISTING LISTE DES PIÈCES 5 10 11 12 13A 13B 14 6 7 8 9 ...

Страница 4: ...4 PARTS LISTING LISTE DES PIÈCES 1 5 1 3 4 2 ELECTRICAL OUTLET PRISE ÉLECTRIQUE ON OFF TOUCH SWITCH INTERRUPTEUR TACTILE ON OFF USB PORT PORT USB ...

Страница 5: ...N HEAD SCREW ST4 38MM VIS À TÊTE CYLINDRIQUE ST4 38MM 4 9 SCREW CAP COUVRE VIS 4 10 HOLE CAP CACHE TROUS 16 11 STICKER CAP CACHE TROU AUTOCOLLANT 4 12 SHELF SUPPORT PEG SUPPORT DE TABLETTE 16 13A HINGE PLATE PLAQUE POUR CHARNIÈRE 4 13B HINGE CHARNIÈRE 4 14 GLASS SHELF TABLETTE EN VERRE 4 HARDWARE LISTING LISTE DE QUINCAILLERIE FOR SURFACE MOUNTED INSTALLATION SEE PAGE 7 FOR RECESSED INSTALLATION S...

Страница 6: ... TALL SINGLE DOOR MODEL SIZE SPECIFICATIONS MODÈLE HAUT À PORTE SIMPLE DIMENSIONS 15 4 WALL MOUNTED SUSPENDU RECESSED ENCASTRÉ FRONT VIEW VUE DE FACE SIDE VIEW VUE DE CÔTÉ SIDE VIEW VUE DE CÔTÉ 60 5 1 4 ...

Страница 7: ... POSITION NIVELER ET MARQUER L EMPLACEMENT DU CABINET BOTTOM OF CABINET MUST BE BETWEEN 27 TO 30 FROM BOTTOM OF JUNCTION BOX LE BAS DU CABINET DOIT SE SITUER ENTRE 27 ET 30 DEPUIS LE BAS DU BOÎTIER DE RACCORDEMENT JUNCTION BOX BOÎTIER DE RACCORDEMENT 27 TO30 27 À 30 60 15 KEEP 12 MINIMUM CLEARANCE ABOVE THE FLOOR GARDER UN MINIMUM DE 12 DE DÉGAGEMENT AU DESSUS DU PLANCHER ...

Страница 8: ...8 DRILL AND INSERT THE WALL PLUGS PERCER ET INSÉRER LES CHEVILLES 4 6 3 MARK THE BOTTOM SUPPORT HOLES ON THE WALL MARQUER LES TROUS DU SUPPORT INFÉRIEUR SUR LE MUR 4 JUNCTION BOX BOÎTIER DE RACCORDEMENT ...

Страница 9: ...PRÉCÉDEMMENT PUIS L INSTALLER 6 LOCATE THE STUDS IN THE WALL LOCALISER LES MONTANTS DANS LE MUR STUD DETECTOR DÉTECTEUR DE MONTANTS IF MODEL COVERS MULTIPLE STUDS LOCATE ALL THE STUDS SI LE MODÈLE COUVRE PLUSIEURS MONTANTS LOCALISER TOUS LES MONTANTS FIND THE STUD IN THE WALL TROUVER LE MONTANT DANS LE MUR 4 8 ...

Страница 10: ...E SUPPORT INFÉRIEUR SUR LE MONTANT 7 MARK THE STUD ON THE BOTTOM SUPPORT MARQUER LE MONTANT SUR LE SUPPORT INFÉRIEUR IF MODEL COVERS MULTIPLE STUDS MARK ALL THE STUDS SI LE MODÈLE COUVRE PLUSIEURS MONTANTS MARQUER TOUS LES MONTANTS 7 USE 3 32 DRILL BIT UTILISER LA MÈCHE 3 32 ...

Страница 11: ...NSTALLATION INSTALLATION DU CÔTÉ DROIT LEFT SIDE INSTALLATION INSTALLATION DU CÔTÉ GAUCHE 9 32 7MM 9 32 7MM USE 9 32 7MM WRENCH TO FASTEN THE NUT UTILISER UNE CLÉ DE 9 32 7MM POUR MAINTENIR L ÉCROU USE 9 32 7MM WRENCH TO FASTEN THE NUT UTILISER UNE CLÉ DE 9 32 7MM POUR MAINTENIR L ÉCROU ...

Страница 12: ...12 10 INSTALL THE TOP BRACKETS INSTALLER LES SUPPORTS SUPÉRIEURS SIDE VIEW VUE DE CÔTÉ B A 5 ...

Страница 13: ...enced in the diagram above is based on conventional standards and may differ between households If there is any confusion as to how these should be connected please seek the help of a licensed professional electrician Electric shock fire hazard and death are possible consequences of poor wiring for none of which Fleurco will be held liable MUR WALL MEDICINE CABNET MISE À LA TERRE habituellement ve...

Страница 14: ...THE WALL PLACER LE CABINET SUR LE MUR MAKE SURE THE BRACKET IS ALIGNED WITH THE STUD S ASSURER QUE LE SUPPORT EST ALIGNÉ AVEC LE MONTANT IN THE CASE WHERE BRACKET DOESN T REACH THE STUD USE A WALL PLUG AND SCREW 8 DANS LE CAS OÙ LE SUPPORT N ATTEINT PAS LE MONTANT UTILISER UNE CHEVILLE ET UNE VIS 8 ...

Страница 15: ...NSTALLER LES CHARNIÈRES A D B C PLACE THE DOOR ON CARDBOARD BOX TO INSTALL THE HINGES PLACER LA PORTE SUR LA BOÎTE DE CARTON POUR INSTALLER LES CHARNIÈRESPORTE 13B OPEN THE HINGES AS INDICATED OUVRIR LES CHARNIÈRES COMME INDIQUÉ ...

Страница 16: ...LES PANNEAUX LATÉRAUX REMOVE ADHESIVE TAPE FROM THE SIDE PANEL BEFORE INSTALLING MAKE SURE THAT PANEL IS ALIGNED WITH CABINET FRAME ENLEVER LE RUBAN ADHÉSIF DU PANNEAU LATÉRAL AVANT D INSTALLER VÉRIFIER QUE LE PANNEAU EST ALIGNÉ AVEC LE CADRE DU CABINET TOP VIEW VUE DE DESSUS 1 1 ...

Страница 17: ...ES PERFORATIONS PERMETTENT LE RÉGLAGE DE LA HAUTEUR DES TABLETTES FOR SAFETY REASONS ALWAYS INSTALL A SHELF ON THE FIRST ROW OF HOLES ABOVE ELECTRICAL BOX ELECTRICAL BOX IS NOT DESIGNED TO HOLD PRODUCTS POUR DES RAISONS DE SÉCURITÉ TOUJOURS INSTALLER UNE TABLETTE SUR LA PREMIÈRE RANGÉE DE TROUS AU DESSUS DE LA BOÎTE ÉLECTRIQUE LA BOÎTE ÉLECTRIQUE N EST PAS CONÇUE POUR SUPPORTER DES PRODUITS ...

Страница 18: ...14 12 INSTALL THE HOLE CAPS INSTALLER LES CACHE TROUS 10 11 NOTE THAT HOLE CAPS 10 ARE FOR SHELVES HOLES AND ADHESIVE CAPS 11 ARE FOR OTHER HOLES NOTER QUE LES CACHE TROUS 10 SONT POUR LES TROUS DES TABLETTES ET LES CACHE TROUS AUTOCOLLANTS 11 SONT POUR LES AUTRES TROUS ...

Страница 19: ... B SIDE VIEW VUE LATÉRALE SIDE VIEW VUE LATÉRALE ALIGN THE DOOR WITH FRAME I ALIGNER LA PORTE AVEC LE CADRE ADJUST THE GAP BETWEEN DOOR AND CABINET I AJUSTER L ESPACE ENTRE LA PORTE ET LE CABINET FRONT VIEW VUE DE FACE FRONT VIEW VUE DE FACE ...

Страница 20: ...N FOR THE RECESSED CABINET NIVELER ET MARQUER LES DIMENSIONS D ENCASTREMENT DU CABINET 12 14 3 4 59 1 8 KEEP 12 MINIMUM CLEARANCE ABOVE THE FLOOR GARDER UN MINIMUM DE 12 DE DÉGAGEMENT AU DESSUS LEPLANCHER LEVEL AND MARK THE CABINET POSITION NIVELER ET MARQUER L EMPLACEMENT DU CABINET ...

Страница 21: ...CORDEMENT 59 1 8 14 3 4 27 TO30 27 À 30 WALL PREPARATION AND JUNCTION BOX POSITION PRÉPARATION DU MUR ET EMPLACEMENT DU BOÎTIER DE RACCORDEMENT IT IS RECOMMENDED TO INSTALL JUNCTION BOX ON THE OPPOSITE SIDE OF THE ADJACENT STUD ON THE LEFT BOTTOM OF THE CABINET MUST BE AT BETWEEN 27 TO 30 FROM THE BOTTOM OF JUNCTION BOX IL EST RECOMMANDÉ D INSTALLER LE BOÎTIER DE RACCORDEMENT SUR LA FACE OPPOSEE D...

Страница 22: ...nced in the diagram above is based on conventional standards and may differ between households If there is any confusion as to how these should be connected please seek the help of a licensed professional electrician Electric shock fire hazard and death are possible consequences of poor wiring for none of which Fleurco will be held liable MUR WALL MEDICINE CABNET MISE À LA TERRE habituellement ver...

Страница 23: ...LLATION INSTALLATION DU CÔTÉ DROIT LEFT SIDE INSTALLATION INSTALLATION DU CÔTÉ GAUCHE 9 32 7MM USE 9 32 7MM WRENCH TO FASTEN THE NUT UTILISER UNE CLÉ DE 9 32 7MM POUR MAINTENIR L ÉCROU 13A 9 32 7MM USE 9 32 7MM WRENCH TO FASTEN THE NUT UTILISER UNE CLÉ DE 9 32 7MM POUR MAINTENIR L ÉCROU ...

Страница 24: ...ANS LE MUR SECURE THE MEDICINE CABINET INTO THE WALL SÉCURISER LE CABINET DANS LE MUR 7 8 7 9 DON T TIGHTEN THE SCREW WITH A DRILL USE A SCREWDRIVER TO TIGHTEN THE SCREW NE PAS SERRER LA VIS AVEC UNE PERCEUSE UTILISER UN TOURNEVIS POUR SERRER LA VIS 1 3 4 2 ...

Страница 25: ...NDICATED OUVRIR LES CHARNIÈRES COMME INDIQUÉ INSTALL THE HINGES INSTALLER LES CHARNIÈRES A D B C 9 13B PLACE THE DOOR ON CARDBOARD BOX TO INSTALL THE HINGES PLACER LA PORTE SUR LA BOÎTE DE CARTON POUR INSTALLER LES CHARNIÈRES ...

Страница 26: ...ORATIONS PERMETTENT LE RÉGLAGE DE LA HAUTEUR DES TABLETTES FOR SAFETY REASONS ALWAYS INSTALL A SHELF ON THE FIRST ROW OF HOLES ABOVE ELECTRICAL BOX ELECTRICAL BOX IS NOT DESIGNED TO HOLD PRODUCTS POUR DES RAISONS DE SÉCURITÉ TOUJOURS INSTALLER UNE TABLETTE SUR LA PREMIÈRE RANGÉE DE TROUS AU DESSUS DE LA BOÎTE ÉLECTRIQUE LA BOÎTE ÉLECTRIQUE N EST PAS CONÇUE POUR SUPPORTER DES PRODUITS ...

Страница 27: ...27 12 13 INSTALL THE GLASS SHELVES INSTALLER LES TABLETTES EN VERRE INSTALL HOLE CAPS AND SCREW CAPS INSTALLER LES CACHE TROUS ET LES COUVRE VIS 9 11 14 12 ...

Страница 28: ... B SIDE VIEW VUE LATÉRALE SIDE VIEW VUE LATÉRALE ALIGN THE DOOR WITH FRAME I ALIGNER LA PORTE AVEC LE CADRE ADJUST THE GAP BETWEEN DOOR AND CABINET I AJUSTER L ESPACE ENTRE LA PORTE ET LE CABINET FRONT VIEW VUE DE FACE FRONT VIEW VUE DE FACE ...

Отзывы: