60
right descends gradually and disappears
inside a tunnel where it splits into a double
track. By using the advantages of the "thin-
king” points, it can be used as a hidden
siding or a passing loop.
Another important operational element of
the layout is the industrial connection with
its small factory and goods shed. The point
branching off here can be switched using
the wire bridging clips can be arranged so
that the main line always has power, but the
siding has its power switched off by the
point setting to "straight” – made possible
just by removing the wire bridging clip from
the
straight section
of the point.
The corresponding parts list and the track
plan (Fig. 24) can be found in the adjoining
section. Now all you need to do is, to add
electric point motors to the points, if desi-
red (see page 27) – and you’re off on an
exciting journey.
21-9300-0104.indd 60
04.07.2016 13:45:11
Содержание 931884
Страница 7: ...7 1 2 3 21 9300 0104 indd 7 04 07 2016 13 45 01...
Страница 9: ...4 9 START SET A START SET A B 21 9300 0104 indd 9 04 07 2016 13 45 01...
Страница 11: ...11 5 6 7 6720 6720 671001 21 9300 0104 indd 11 04 07 2016 13 45 04...
Страница 13: ...13 8 1 2 9 10 21 9300 0104 indd 13 04 07 2016 13 45 04...
Страница 17: ...17 13 14 1 14 2 21 9300 0104 indd 17 04 07 2016 13 45 08...
Страница 19: ...19 15 16 17 21 9300 0104 indd 19 04 07 2016 13 45 08...
Страница 21: ...21 18 21 9300 0104 indd 21 04 07 2016 13 45 08...
Страница 23: ...23 A B A C A D 19a 21 9300 0104 indd 23 04 07 2016 13 45 09...
Страница 24: ...24 19b A E A F 21 9300 0104 indd 24 04 07 2016 13 45 09...
Страница 26: ...26 20 21 9300 0104 indd 26 04 07 2016 13 45 10...
Страница 29: ...29 22 21 9300 0104 indd 29 04 07 2016 13 45 10...
Страница 36: ...36 23 Abb H0 21 9300 0104 indd 36 04 07 2016 13 45 11...
Страница 37: ...37 21 9300 0104 indd 37 04 07 2016 13 45 11...
Страница 38: ...38 24 21 9300 0104 indd 38 04 07 2016 13 45 11...
Страница 39: ...39 21 9300 0104 indd 39 04 07 2016 13 45 11...