Printed in U.S.A.
Page 5
MODEL 5600SE Upflow
Control Start-up Procedures (Cont’d.)
Depending on current control programming, option setting displays that are not required to be set will not be
viewed.
3. Push the Extra Cycle Button. The third option setting display that appears is Regeneration
Day Override. Using the Set Up or Down Buttons, set the maximum number of days before
a regeneration cycle must occur. For Example:
4. Control programming is now complete. Push the Extra Cycle Button. This will exit the
control from the Programming Mode, and resume Normal Operation.
1. The first option setting display that appears in the Program Mode is Treated Water
Capacity. Using the Set Up or Down Buttons, set the amount of treated water that can flow
through the unit before a regeneration is required. For Example:
2. Push the Extra Cycle Button. The second option setting display that appears is
Regeneration time. Using the Set Up or Down Buttons, set the desired time of day when a
regeneration can occur, if required. For Example:
3.
Set Control Programming
Содержание 5600SE
Страница 24: ...Page 24 Printed in U S A MODEL 5600SE Upflow 2310 Safety Brine Valve See Opposite Page for Parts List...
Страница 31: ......
Страница 32: ...P N 19746 Rev 4 04 01...