150718
PL
YFL
Y
rev
A_GoKart
| Augu
st 7, 20
15 5:0
8 PM
Required hardware
№ DESCRIPTION
REFERENCE
8 Sheetmetal Screw
Galvanized, #6
PN 12551
5 Button Socket Head Cap Screw
Zinc Plated, Steel, M8, 12mm L
TOTAL OF 5 PROVIDED
PN 12515
1 Hex head cap screw
5/16”‑18, 1.25 L
4.0 HP MODEL
PN 12543
1 Hex Cap Screw
1/4”‑20, 1” L
2.5 HP MODEL
PN 12554
1 Flat Washer
5/16” ID, 7/8” OD
PN 12516
1 Fender washer
5/16” ID, 1‑1/8” OD
PN 12555
1 Lock washer
5/16” ID
1 Clutch Key
3/16”, 1/2” L
PN 12557
2 Set Screw
Clutch
PN 12563
1 Pan head
M6, 12 mm L
4.0 HP MODEL
PN 12564
Part 7 Install the engine and drive train
The engine arrives with no oil, no configuration is required.
INSTRUCTION
1. Stand the engine on part 50 located on
9
,
aligning the engine mounting holes to the tee nut pattern
(installed previously) appropriate for the engine model.
Note
the location of the engine mount.
Note
the location of the tee nut bolting pattern on part 50.
Note
the direction and orientation of the engine within the go-kart.
2. For next installation step:
‒
2.5 HP MODEL
continue to step 3.
‒
4.0 HP MODEL
continue to step 4.
50
9
2
1
4
3
2.5 HP
4.0 HP
2
1
4
3
50
50
52
10 Putting the go‑kart together
Содержание plyfly
Страница 1: ...For Ages 12 PlyFly Go Kart Instruction Guide 2015 Release HOW TO BUILD YOUR PLYFLY GO KART...
Страница 64: ...150718 PLYFLY rev A_EM August 7 2015 5 06 PM 60 11 Master List...
Страница 76: ...150718 PLYFLY rev A_Legal August 5 2015 10 3 8 PM 72 12 Legal...
Страница 78: ...150718 PLYFLY rev A_Terms Conditions A u g u s t 5 2 0 1 5 1 0 3 8 P M 74 13 Terms Conditions...