![Flame Energy XVR-I SE Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/flame-energy/xvr-i-se/xvr-i-se_installation-and-operation-manual_2302421037.webp)
XVR-I SE Installation and Operation Manual
37
The best flue pipe assembly is one that rises straight up from the stove to the base of the
chimney with no elbows. Straight assemblies are less likely to cause problems like smoke
roll-out when the door is opened for loading. They are also more stable and easier to
maintain than assemblies with elbows. Horizontal runs of flue pipe should be avoided
where possible because they reduce chimney draft.
Use 45 degree elbows where possible, instead of 90 degree elbows.
The rules below are based on those found in the CSA B365 installation code. Please
carefully follow these installation instruction rules, or those enforced where you live.
•
Maximum overall length of straight pipe: 3 m (10 ft.) including elbows.
•
Minimum clearance from combustible material: 450 mm (18 in.). The minimum
clearance may be reduced by 50 percent to 225 mm (9 in.) if suitable shielding is
installed either on the pipe or on the combustible surface.
•
The assembly should be as short and direct as possible between the stove and
chimney. The use of two 45 degree elbows is often preferable to a single 90 degree
Содержание XVR-I SE
Страница 7: ...XVR I SE Installation and Operation Manual 7 ...
Страница 28: ...XVR I SE Installation and Operation Manual 28 Clearances to combustible materials and floor protection ...
Страница 40: ...XVR I SE Installation and Operation Manual 40 Installation on the bottom AC01337 ...
Страница 45: ...XVR I SE Installation and Operation Manual 45 Appendix 4 Exploded Diagram and Parts List ...