Troubleshooting

To reset the pressure switch

A pressure switch is mounted on each compressor

To reset the protective motor switch:

The protective motor switches are mounted in the control
equipment cubicle.

Remedial measures

Check that there is voltage on all
phases and that the phase sequ-
ence is correct.

Start the fans or test by fitting a jumper
between wiring terminals 55 and 56.

Wait 2 minutes for the dampers to
open before starting the cooling unit.

High pressure switch has tripped.
Reset button is on the pressure
switch. The load is too great or
there is too little air. Check that
filter and coils are not clogged.

Low pressure switch has tripped.
Ingoing air temperature is too low or
there’s a shortage of refrigerant.

Tripped motor protection or ther-
mistor. Press motor protection
button to reset it or let the com-
pressor motor cool off.
Check after resetting the motor
protection that the compressor
operates without abnormal noise.

High pressure switch with automatic
reset has tripped and compressor 1
is switched off for 5 min.
Check that filter and coils are not
clogged.

Check that the control signal is at
least 30% for start of first com-
pressor.
To start all the compressors, the
signal should be at least 90%

Current compressor will start after
a delay of approx. 5 min. Wait!

Current compressor should now
have started. If not, check that
voltage is coming from the com-
pressor contactor. If there is vol-
tage, the compressor is probably
defective.

Display text:

* 3-phase alarm *

* fan Stop *

* Start wait 2 min *

’Alarm H’ alt.
’Alarm High pres.’

’Alarm L’ alt.
’Alarm low pres.’

Alarm Q alt.
Alarm Q1 / Term

1= Capac. alt.
1= Capac. Control

Signal % <030

1/2/3/4 = start

1/2/3/4 = run

Caution!

Faults should always be cleared without
delay!
All service and maintenance should be
performed by professionals!
Service/maintenance of the cooling sys-
tem must only be performed by accre-
dited company with authorized per-
sonnel wearing protective equipment!

Press here

Содержание EQKA

Страница 1: ... Connections 3 Installation and Commissioning 4 Operation and Care 5 Use 6 Maintenance 7 Troubleshooting 8 Refrigeration Flow Chart 9 Docking 10 EQKA Cooling unit Fläkt Woods 8643 GB 2012 11 1 We reserve the right to alter specifications Installation and Maintenance Instructions ...

Страница 2: ...ied out by a professional Service maintenance of the cooling system must only be carried out by an accredited company and qualified personnel wearing required protective equipment gloves and protective eye glasses Automatic start Open and lock the main switch of the cooling unit before beginning any work on the unit Do NOT stand on the cooling unit Use only genuine spare parts for maintenance Negl...

Страница 3: ... air handling unit or another unit acrossamonitoringunit This alarm group can be obtained as potential free contacts at pins 57 and 58 on wiring terminals To prevent unnecessary stops and alarm from the cooling unit it should be interlocked across the extract air fan FF Connect the cooling unit as illustrated in the wiring diagram below Incoming 3x400V supply To be connected to main switch in cool...

Страница 4: ...pre heated Settheprotectivemotorswitchofthe compressors to position 0 Off Set the main switch insi de the cooling unit to position 1 On and activate the control circuit fuse The crank case heater now heats up the compressor If the ambient temperature is below 15 C wait for 4 8 hours until the compressor has become warm before you start up the compressors To set the setpoint for cooling When coolin...

Страница 5: ...t fuse Protective motor switch Control unit with display Refrigerant tank Component description Control unit RC1 The control unit is located in the door of the cubicle See the description on page 9 Control circuit fuse To reset the miniature circuit breaker pull the black actuator button upward Main switch Use the main switch for switching the cooling unit on off Always switch off the main switch ...

Страница 6: ...ls Cooling unit with hot gas bypass On a 20 control signal the ICM2 with hot gas valve starts in the fully open position The hot gas valve closes linearly between 2 and 8 V The KMI starts at 8 V and the valve opens 40 Between 8 and 10 V the valve closes again Stepping levels Stepping out of each step occurs 20 2 0V during stepping level for 2 or 3 compressors and 10 1 0v During the stepping level ...

Страница 7: ...as 4 Safety equipment tripping function on the pressure switches 5 Cooling capacity 6 Control feedback control equipment Performance check 7 Electric equipment retightening of power supply connections 8 Cleaning Coils drip tray drainage 9 Air filter Recurring checks Mustonlybecarriedoutbyarefrigerationservicecompany Inspect the system at least once every 12 months and main tainajournal Checkthefol...

Страница 8: ...et it or let the com pressor motor cool off Check after resetting the motor protection that the compressor operates without abnormal noise High pressure switch with automatic reset has tripped and compressor 1 is switched off for 5 min Check that filter and coils are not clogged Check that the control signal is at least 30 for start of first com pressor To start all the compressors the signal shou...

Страница 9: ...high pressure GP1a 1 In service pressure switch high pressure GP2 1 GP2 2 GP2 3 Protective pressure switch low pressure KD 1 KD 2 KD 3 Condenser KD W Water cooled condenser optional KM 1 KM 2 KM 3 Compressor MU1 1 MU1 2 MU1 3 Measurement tapping high pressure MU2 1 MU2 2 MU2 3 Measurement tapping low pressure SG 1 SG 2 SG 3 Sight glass SÄV Safety valve VS 1 VS 2 VS 3 Expansion valve VW Pressure co...

Страница 10: ...Fläkt Woods 8643 GB 2012 11 10 We reserve the right to alter specifications Installation and Maintenance Instructions EQKA Cooling unit Jointing Externally Jointing Internally A C B D A B D C ...

Отзывы:

Похожие инструкции для EQKA