18
ASSEMBLY INSTRUCTIONS
STEP 10
1. Equip main cabe(B3) into leg developer(A10).Insert it into pulley(B6) & leg developer(A10).Put
metal bushing (C18) at both side of leg developer(A10),then fix it by bolt(C4),washer(C14) &
nut(C15).
2. Equip main cable(B3) into main support tube(A5).Insert it into pulley(B6) & main support
tube(A5).Put metal bushing(C18) at both side of main support tube(A5),then fix it by
bolt(C4),washer(C14) & nut(C15).
3. Equip main cable(B3) into pulley bracket(D8),then equip it on pulley(B6).Then fix it by bolt(C6)
& washer(C14), through(D8)/(B6),fix it by(C14)/nut(C15).
4. Equip main cable(B3) into main base tube(A1),then equip it under pulley(B6).Then fix it by
bolt(C6) & washer(C14) through(A1)/(B6),fix it by(C14)/nut(C15).
5. Equip main cable(B3) into pulley bracket(D9),then equip it on pulley(B6).Then fix it by bolt(C6)
& washer(C14), through(D9)/(B6),fic it by(C14)/nut(C15).
6. Equip chain(B5) into main base tube(A1),then fix it by hook(D7).Adjust main cable(B3) and
connect it with chain by hook(D7).
Содержание F4H-HG-TF7001
Страница 4: ...4 PARTS LIST...
Страница 5: ...5 EXPLODED DIAGRAM...
Страница 6: ...6 PARTS TABLE...
Страница 7: ...7 PARTS TABLE...
Страница 15: ...15 ASSEMBLY INSTRUCTIONS...
Страница 22: ...22...