59
Phase 39:
STEP 1:
Anchor-It and Tether Installation.
Important!: Anchor-Its MUST be installed before unit can be used.
1.
Determine the final location of your activity center.
2.
Place the Anchor-It stakes adjacent to the base and near the corners of your activity center (at the bottom of the
legs on swing sets) and twist the auger-style stakes into the ground until only the loop is exposed as shown in.
3.
Place the metal strap through the loop of the Anchor-It stake and secure it to the unit with a lag screw and
washer as illustrated to the right. Note: Attach the strap to the unit with as little play as possible using whatever
holes in the strap that work best.
4. Tether Installation:
Locate the first plank from the Bridge Platform with a Cleat attached and install anchor-it
into the ground directly below it.
5.
Insert Eye Strap into opposite end of Tether and attach to underside of plank as shown in .
Anchor-It
a n
h
e
r
Anchor-It and Tether
Phase Hardware
Phase Hardware
1 3/16
"
(2) 25 33/55'' Lag Bolt
5/16'' Flat Washer
Anchor-lt
5/16 x1 3/4'' Socket Pan- Head Bolt
5/16" Lock Nut
5 1/4
"
1 3/16
"
5 1/4
"
1 3/4'' Socket Pan- Head Bolt
5/16" Lock Nut
A n ch o r-It
5/16'' Flat Washer
5/16'' Flat Washer
BRIDGE ASSEMBLY
PF3808
STEP 2:
PF3808
3/8"
N (2)
G1 (2)
E 5(2)
K1 (4)
Содержание MA3201
Страница 23: ...21...
Страница 24: ...22 Phase 2...
Страница 25: ...Phase 3 23...
Страница 26: ...Phase 4 24...
Страница 27: ...Phase 5 25...
Страница 29: ...27 Phase 7...
Страница 31: ...Phase 9 29...
Страница 47: ...45...