![Fisher FSL-1100B-H-3F Скачать руководство пользователя страница 2](http://html.mh-extra.com/html/fisher/fsl-1100b-h-3f/fsl-1100b-h-3f_operation-manual_2294438002.webp)
Preface
FISHER
ducted air-conditioning units are elaborately designed and produced with high
quality, reliability and adaptability.
Please read this instruction thoroughly before operation and maintenance.
The installation should be carried out by the qualified service technicians.
FISHER
will not be responsible for the personal injury or property damage resulting from improper
installation and adjustment, unnecessary maintenance and those do not follow the instructions in this
manual.
The scope of guarantee must accord with the following items:
The first start-up should be carried out by qualified service technicians appointed by the service center
of
FISHER
.
The components of air-conditioning units should only be provided by
FISHER
Company. The specified
time and frequency of the operation and maintenance items in this manual should be strictly executed.
Any violation of the precedent items will lead to the invalidation of guarantee.
All of the figures and messages are for reference only. Since The
FISHER
has
a policy of continuous
product improvement, he reserves the right to change design and specifications of
the products
at any time without notice.
R410A(R32/125: 50/50)
GWP
:
1900