10
INSTALLER CHECKLIST
TO BE COMPLETED BY THE INSTALLER
Turn the power to the coffee maker on. The display should turn on.
Fill the water tank to the indicated level.
Have you demonstrated basic operation to the customer?
Make sure the coffee maker is level and securely fitted to the cabinetry.
Check the lower trim is undamaged.
Check there is adequate clearance. This is to ensure correct air circulation.
Make sure any cable ties and internal packaging has been removed from the
coffee maker.
Make sure all vents and openings are clear and free of any obstruction or damage.
Failure to make sure all vents are clear may result in poor product performance.
Make sure the isolating switch is accessible to the customer.
Complete and keep for safe reference:
Model
Serial No.
Purchase Date
Purchaser
Dealer Address
Installer’s Name
Installer’s Signature
Installation Company
Installation Date
Содержание EB76PSX1
Страница 1: ...PROFESSIONAL EB76PSX1 models BUILT IN COFFEE MAKER INSTALLATION GUIDE NZ AU ...
Страница 2: ......
Страница 11: ......