21. To apply the rim height sticker (S), first use a tape measure to crank rim up to exactly 10’ from the
playing surface. Use a pencil to make a mark on the spring-assist outer tube where the rim height
indicator stops. Then, peel and apply sticker to outside of spring-assist cartridge lining up the pencil
mark with the 10’ mark on the sticker. See Figure A for a diagram of a completed height indicator
assembly.

Note: It is advisable to wait up to two weeks to allow the anchor footing to fully cure before aggressive
play.

 

FIRST TEAM SPORTS, INC.

902 COREY ROAD

HUTCHINSON, KS 67501

TOLL FREE: 888-884-6677

Содержание Attack Series

Страница 1: ...m Height Sticker D 1 H Frame Backboard Mount L 12 5 8 Hex Nut T 1 Rim Height Indicator E 1 Spring Assist Cartridge M 1 Anchor Footing Template U 4 5 8 Lockwasher F 1 Crank Adjustment Cylinder N 4 Anchor Footing Rebar V 1 Anti Seize Lubricant G 2 x 4 Hex Bolt O 8 5 16 x 1 Machine Screw W 2 Pivot Stop Caps H 5 x 10 Hex Bolt P 8 5 16 Flat Washer NOTE Immediately unpack all components and cross check ...

Страница 2: ...ve enough concrete to finish the job Allowing a portion to dry while you purchase more concrete will weaken the footing 6 Mix the concrete according to the instructions on the bag It is better to mix it slightly wet than too dry Fill the hole full to ground level with as little time between batches as possible Insert the broomstick in 3 or 4 different places and vibrate up and down to settle the c...

Страница 3: ...ng D to the backboard as shown in figure D Use the 8 5 16 x 1 machine screws O 8 5 16 flat washer P 8 5 16 lockwasher Q 8 5 16 hex nuts R If your backboard is tempered glass check to make sure all four steel grommets are located at the rim holes if any are missing check in the box If grommets are missing and cannot be located DO NOT proceed with assembly call First Team immediately If your backboa...

Страница 4: ... indicator stops Then peel and apply sticker to outside of spring assist cartridge lining up the pencil mark with the 10 mark on the sticker See Figure A for a diagram of a completed height indicator assembly Note It is advisable to wait up to two weeks to allow the anchor footing to fully cure before aggressive play FIRST TEAM SPORTS INC 902 COREY ROAD HUTCHINSON KS 67501 TOLL FREE 888 884 6677 ...

Отзывы: