Fuse rating 

 
Check  fuse  rating.   If  possible,  refer  to  manufacturer's user  guide.  Otherwise 
follow guidelines below: 

 
3A or 5A fuse fitted: NO action. 
13A fuse fitted: Then check power rating. 

If power is less than 700 W then fit 3 Amp Fuse. 
If power is more than 700 W then NO action. 

 
 
 

 

Examples: 

 
 
 
 
 
 
 
 
 

 
40W rating, requires 3A fuse.  

 

1200W rating, requires 13A fuse. 

 
 
If the equipment fails on any of the above points, then it must be taken out of 
service,  a  "DO  NOT  USE"  label  applied  and  not  used  again  until  it  has  been 
properly repaired and tested. 
 

Under  no  circumstances  must  one  proceed  with  the  testing 
stage, if a failure is found during the Formal Visual Inspection 
stage. 

 

 
 
 
 
 

BattPAT  

 

 

 

 

 

 

 

 

 

 

Issue 2. 

Содержание BattPAT

Страница 1: ...BattPAT Battery Powered Portable Appliance Tester User Manual Issue 2...

Страница 2: ...ug external 11 Plug internal 11 Fuse rating 12 OPERATION Testing Class I equipment 13 Class I Earth Connection 14 Testing Class II equipment 15 Testing IEC leads 16 Testing mains extension leads 17 Pr...

Страница 3: ...provided is for the testing of IEC leads Take great care not to plug an IEC lead into the mains and then into this socket However if this should happen accidentally the unit is protected internally 4...

Страница 4: ...in the shipment BattPAT unit Battery charger Earth test lead Short IEC lead User manual Equipment Register form Test Record form 100 Tested 5 Failed and 50 Fuse labels Check for any damage in transit...

Страница 5: ...ument very easy to use The instructions labels and sample records supplied make it very easy for anyone to undertake safety testing on all electrical appliances The user has only to decide whether the...

Страница 6: ...e test and an overall PASS or FAIL CLASS II TEST When this button is pressed the unit will test Insulation Resistance showing the result for the test and an overall PASS or FAIL APPLIANCE POWER ON TES...

Страница 7: ...e charge LED flashes After this the battery is charged at a lower rate for another 6 hours The charge LED is on steady during this time The BattPAT can be powered using the charger if the battery is f...

Страница 8: ...that the equipment is Class I Mains extension leads and IEC leads are treated as Class 1 appliances Type of equipment For the purpose of planning electrical equipment is categorized into 5 types as s...

Страница 9: ...in low risk environments such as offices shops hotels and nursing homes Timescales for other environments can be found in Appendix I Class I Class II Type Inspection Insp test Inspection Insp test St...

Страница 10: ...story of visual inspection and testing Formal Visual Inspection is a very important part of making sure that appliances are safe to use In fact the majority of faults can only be found by a good visua...

Страница 11: ...Plug internal In addition to the above the plug cover if it is not molded needs to be taken off and check that the cable terminations are correct Examples of faults Fuse not being used Bare wires vis...

Страница 12: ...Amp Fuse If power is more than 700 W then NO action Examples 40W rating requires 3A fuse 1200W rating requires 13A fuse If the equipment fails on any of the above points then it must be taken out of s...

Страница 13: ...an overall Pass or Fail If the appliance Power switch is turned OFF then the green LED will flash as a reminder to the user If the user turns the switch ON within 5 seconds the test will continue and...

Страница 14: ...on Resistance will be tested and a Pass or Fail will be displayed Once the testing is complete record the results on the Test Record Class I Earth Connection Finding a good earth on Class I appliances...

Страница 15: ...result for the Insulation Resistance as well as an overall Pass or Fail If the appliance Power switch is turned OFF then the green LED will flash as a reminder to the user If the user turns the switch...

Страница 16: ...ds of the IEC lead into the BattPAT One end into the mains socket and the other end into the IEC socket Press the Power cord button The test will be run and the result for Earth Continuity Insulation...

Страница 17: ...stance test is carried out at 360V This means that surge protected mains extensions will pass when this test is carried out on the BattPAT Note 3 The BattPAT is designed to pass leads with lengths up...

Страница 18: ...res a 110 V adaptor Just plug the adaptor into the BattPAT and connect the appliance to be tested into the yellow 110 V socket Then use the BattPAT as normal Testing 3 phase appliances This requires a...

Страница 19: ...ad up to 40m 800 m INSULATION TEST TEST VOLTAGE 360 V SC CURRENT 3 mA TOLERANCE 5 0 1V FAIL THRESHOLD CLASS I 2 M FAIL THRESHOLD CLASS II 4 M POLARITY TEST TEST VOLTAGE 5 V SC CURRENT 0 5 mA WORKING L...

Страница 20: ...UBLIC Class I Class II Type Inspection Insp test Inspection Insp test Stationary monthly 12 months 12 months 24 months IT monthly 12 months 12 months 24 months Movable weekly 6 months 6 month 12 month...

Страница 21: ...month 3 months 1 month 3 months Source The Institute of Electrical Engineers Code of Practice for In service Inspection and Testing of Electrical Equipment Note The above are suggested initial period...

Страница 22: ...ivery Service We can arrange for the BattPAT to be collected for calibration and delivered back to you The turnaround is 5 working days from receipt of the tester All you have to do is to order on lin...

Страница 23: ...alibration expiry date in which to book your tester in for calibration The Lifetime Warranty covers the BattPAT unit only not accessories If your unit develops a fault we repair it free of charge as l...

Страница 24: ...2016 First Stop Safety 11 Glaisdale Road Northminster Business Park York YO26 6QT t 01904 791050 f 01904 352225 e info firststopsafety co uk w www firststopsafety co uk...

Отзывы: