background image

OPERATOR MAINTENANCE 

• 

Check gearbox oil level before first operation and every 200 hours of operation thereafter.  
With frame level, remove oil plug on top side of gear box using 5/16” x 6” allen wrench 
through access hole in frame.  Use a piece of 1/16" dia. wire for checking fluid level.  Push 
wire into hole in gearbox until it hits the bottom. Pull out and measure the amount of oil 
left on wire.  There should be approx.  1-3/4" to 2" of oil on wire.  If required, add 90w-
gear oil through plug in top of box until correct amount appears on wire.  Replace top plug 
securely. 

 

• 

Grease driveline parts after the number hours use as shown in the following chart.  

 

 

Figure 5 Drive Line Lube Chart 

 

• 

The hitch flex joints at the top of the “A” frame and above the gearbox (see page 18) 
should be lubricated before first operation and weekly thereafter. 

 

• 

After the first two hours of operation tighten all tines to 210-ft. lbs.  Check for loose tines 
daily. 

 

• 

When replacing lost or worn tines use a 15/16” extra deep socket (Socket is available 
through our repair parts. Order # AE60T003) and torque to 210 ft. lbs. 

 

• 

CHECK BELT TENSION

 every 4 hrs. of operation for the first 12 hrs. and every 100 

hrs. thereafter. Also, tighten belts if shaft hesitation is noticed during operation.  Over 
tightening belts may cause damage to the machine. Be sure to re-install belt shield after 
servicing. 

 

• 

Use the applicable parts break down illustration pp.16-22 for maintenance removal, and 
assembly instructions.  

 

• 

The AERA-vator shaft and rotor bearings are sealed and permanently lubricated requiring 
no routine maintenance.  

 
 
 
 
 
 
 
 
 

  10

All manuals and user guides at all-guides.com

all-guides.com

Содержание AERA-vator AE40L

Страница 1: ...NC 164 Oakridge Church Rd Tifton Georgia 31794 U S A Phone 229 382 4768 1 800 363 8780 Fax 229 382 0506 Web www 1stproducts com Email Sales 1stproducts com Ser 352 thru __ Printed in U S A PBREV0104 A...

Страница 2: ...chase This machine is designed with safety in mind However if the machine is handled carelessly and not as instructed it can be a dangerous piece of equipment Observe all safety information in this ma...

Страница 3: ...bly Clean the machine thoroughly with a pressure washer 11 II Reassembly and Installation 12 TINE REPLACEMENT 14 SEEDER MAINTENANCE 14 SEEDER CALIBRATION 15 I GENERAL OBSERVATIONS 15 II CALIBRATION PR...

Страница 4: ...tion injury may oc cur used to alert against carelessness WARNING Indicates potentially hazardous situation Death or serious injury may occur if proper procedures are not followed DANGER Indicates mos...

Страница 5: ...WARNING Part No AE50 113 1 STAND CLEAR 10FT WHEN LIFTING SWINGING FRAME HAZARD WARNING MACHINE THE MACHINE Located under shield SAFETY DECALS 4 AERA vator AE 40 TO PREVENT A THROWN OBJECT HAZARD DO N...

Страница 6: ...rce with the engine running After operating always disengage the power take off and switch the engine off prior to dis mounting from the tractor or other power source and approaching the unit Prior to...

Страница 7: ...Only operate during daylight hours or with good artificial light The AERA vator is not equipped for highway use Be careful of traffic when operating near or crossing roadways OPERATOR INSTRUCTIONS Th...

Страница 8: ...again This demonstrates how the top link of the tractor lift system switches the AERA vator between the trail and lift modes Figure 2 Swing Hitch Operation 7 CORRECTLY ADJUSTING THE HITCH TO THE TRACT...

Страница 9: ...5 the mast chains will not swing the unit uphill to center and lock on the tractor when the unit is lifted Occasionally the unit will swing farther to the downhill side of the tractor creating the haz...

Страница 10: ...e any safety decals that are not legible Never attempt to clean adjust lubricate or perform any maintenance on the AERA vator while it is attached to the tractor in the raised position unless safety b...

Страница 11: ...frame and above the gearbox see page 18 should be lubricated before first operation and weekly thereafter After the first two hours of operation tighten all tines to 210 ft lbs Check for loose tines d...

Страница 12: ...Remove the 1 1 8 hex jam nut from the shaft nearest to the damaged rotor see Figure 6 2 Only remove the rotors and spacers as required to reach the damaged component and wipe the shaft clean before e...

Страница 13: ...tall internal snap ring in one side of rotor 2 Press bearing and adapter assembly tight against the ring see Figure 9 3 Install second snap ring 4 Apply a ribbon of general purpose grease between the...

Страница 14: ...S REPLACED 4 Replace the 1 1 8 hex jam nut and rotate each rotor occasionally as the nut is being torqued to 350 ft lbs If any rotor locks up the bearing adapters in the rotor are probably not phased...

Страница 15: ...Lightly oil bearings periodically more often if metering material with fines as pow der may work into bearings Some materials may build up on the hopper bottom especially when atmospheric humidity is...

Страница 16: ...ations seed size humidity temperature and age of product may affect application rates The applicator depends on gravity flow of the product particles through precisely adjusted openings at each tube s...

Страница 17: ...peed between 500 and 600 RPM or as required for the degree of tillage desired The ground speed can be verified by determining the time required to travel a distance of 200 ft per the following speed t...

Страница 18: ...URN AUTHORIZATION NUMBER MUST BE OBTAINED AND CLEARLY MARKED ON ALL PACKAGES OF PARTS REQUIRING RETURN TO THE FACTORY THE OBLIGATION OF FIRST PRODUCTS INC UNDER THIS WARRANTY SHALL BE EXCLUSIVELY LIMI...

Страница 19: ...AE50 094 AE50 063 AE50 090 AE80 094 AE81 012 4 9 11 12 10 6 8 7 5 ITEM NO 2 3 1 ROTOR COMPLETE 17 MAIN FRAME 40L 1 1 8 HEX BEARING DRIVE END SPACER 3 13 16 LONG SPACER 7 1 4 AERA vator DECAL 3 8 FLANG...

Страница 20: ...4 25 23 AE50 007 AE50 006 ORDER NO ITEM NO 3 2 AE50 046 40B16 X 1 1 8 40 2 CHAIN CONN COUPLER CHAIN CPT DESCRIPTION 21 20 ITEM NO 5 16 X 3 4 HEX HD FLG CAPSCREW 5 8 HEX NUT 3 8 X 1 CARRIAGE BOLT 3 8 H...

Страница 21: ...60 9 16 X 4 X 047 SPRING Not Shown LOCK HINGE PIN 60 SWIVEL PIN 40L SWING LOCK LINK 40L 30 26 28 29 27 23 25 24 22 DESCRIPTION SWING MAST 40L SWING STAND 40L A FRAME 40L ITEM NO 3 8 STOVER LOCKNUT SMA...

Страница 22: ...RING INTERNAL AE 5 BRG ADAPTER DESCRIPTION 7 1 2 2 3 3 4 5 6 V BEARING ADAPTER FACE 8 A A VIEW A A TIMING MARK FOR PHASING BEARING ADAPTERS IN THE ROTOR SHAFT ASSEMBLY SEE PAGE 16 ASSEMBLE SEALS WITH...

Страница 23: ...VE LINE CPL SHIELD ASSEMBLY INNER SHAFT W SHIELD OUTER SHAFT W SHIELD DRIVE LINE COMPONENTS AE55 074 COMPLETE DRIVE LINE AE55 077 4 KEEP AWAY DO NOT OPERATE WITHOUT ROTATING DRIVELINE CONTACT CAN CAUS...

Страница 24: ...PER 40 ROLLER FRAME BRACE 40L 21 19 DESCRIPTION SPRING ROD SUPPORT 40L 3 8 STOVER LOCKNUT ROLLER SPRING ROD ITEM NO 16 17 15 1 2 FLATWASHER 1 2 X 2 1 2 HEX CAPSCREW GD 5 1 2 STOVER LOCKNUT 5 16 X 1 2...

Страница 25: ...Cotter Pin 5 7 9 11 12 HW03010064G2ZPC HW03012040G5ZPC AE80 134 AE80 130 3 8 x 1 1 4 Carriage Bolt G5 Groom Rake Brush Arm 5 16 x 2 Carriage Bolt Tine Rod 40 13 15 17 HW03016056G5ZPC HW01010024G5ZPC 1...

Страница 26: ...HW22010G5ZPC 28 5 16 FLANGE LOCK NUT 12 HW22012G5ZPC 29 3 8 FLANGE LOCK NUT 6 HW24012GBZPC 30 3 8 STOVER LOCK NUT 2 HW30012TAZP 31 3 8 FLATWASHER 4 HW32012G5ZP 32 3 8 LOCKWASHER 4 9 9 28116 A 1 42 SEE...

Страница 27: ...OCKET 32T 41 5 8 HEX BORE 1 6 F02 0041 000 ROLLER CHAIN 41 44 LINK 1 7 F02 0041 001 CONNECTOR LINK 41 1 8 C21 0177 020 HAIR PIN COTTER 3 16 8 1 9 09082842 4 ELECTRIC MOTOR ASSEMBLY 1 GANDY 28116 A 42...

Страница 28: ...69 4 ROTOR BAR RUBBER 42 1 9 2894 26 JOURNAL HEX 2 10 2807953 C1 CENTER PLATE 1 11 2894 21 CLEVIS HITCH POLE 1 12 2807373 SPACER CLEVIS 1 13 2891 8 LOWER HANDLE 2842FP 1 14 2807175 CAM GAUGE 1 15 2842...

Страница 29: ...2 1 5 7 3 4 9 8 6 14 15 11 12 13 16 17 10 SEEDER HOPPER 28 All manuals and user guides at all guides com...

Страница 30: ...29 NOTES All manuals and user guides at all guides com...

Страница 31: ...1 2 INCHES VIBRATING DEPTH TINES 9 16 x 3 1 2 FORGED AND HARDENED ROTOR BEARINGS DOUBLE SEALED TAPERED ROLLER FINISH BASIC UNIT BLACK AND GREY ACRYLIC FINISH HOPPER RED POLYESTER HOPPER CAPACITY 3 7 C...

Отзывы: