9
Next, install the Mainframe onto the Side Rail Assembly as shown. You will need
4x M8x45mm bolts[14]
,
8x M8 washers[10]
,
4x M8 standard nuts[11]
and
4x M8
Nylock nuts[12]
.
Secure but do not tighten. You will find that the lower bracket bolts can be difficult
to access. You can tighten these bolts completely with the rower standing in the
vertical position easily once the footboard has been mounted, so for the moment,
simply align and loosely thread lower bolts/nuts.
M8x45mm Bolt
M8 Washer
M8 Washer
M8 Standard Nut
M8 Nylock
Nut
Bolt Assembly Close Up
Note:
Clean wheels and tracks weekly with a soft dry cloth in order to decrease the
rate of wear on both wheels and track.