CAUTION: Control wiring procedures which deviate from those shown in the diagrams may

bypass safety functions designed in the control. Check with the Fireye Representative before

deviating from the recommended wiring diagrams.

FIGURE 3.

ALTERNATE WIRING ARRANGMENT FOR MP100 CONTROLS

Use moisture resistant wire suitable for at least 90

q

C.

S2

3

5

4

1

MAIN

IGNITION

7

8

2

A

6

STOP

PILOT

S1

START

LIMIT SW

FUEL VALVE

ALARM

ON-OFF

HOT

NEUTRAL

LR-1

LR-2

LATCH

AIR FLOW

SWITCH

MOTOR

A. FOR MANUAL START

CONNECTION TO TERM. #1 

IS NOT REQUIRED WITH

MART3 OR MART1T

AMPLIFIER MODULE

A START-STOP STATION MAY BE ADDED TO REQUIRE 

OPERATOR START-UP EACH TIME THE BURNER FIRES.

S2

3

5

4

1

IGNITION

7

8

2

A

6

PILOT

S1

B. MULTIPLE BURNER SYSTEMS

S2

3

5

4

1

IGNITION

7

8

2

A

6

PILOT

S1

LIMIT

R

MANUAL RESET

MAIN GAS VALVE

ALARM

S.P.D.T.

RA

ALARM SILENCE

SWITCH

G

R

STOP

START

LR-1

AIR FLOW

COIL OF MOTOR

CONTACTOR

LATCH

HOT

NEUTRAL

MULTIPLE BURNER SYSTEMS UTILIZING SEMI-AUTOMATIC OPERATION INCORPORATE THE FIREYE

MODULAR M-SERIES II CONTROLS IN A CASCADING SEQUENCE WHEN PILOT #1 IS PROVEN. TRIAL

FOR IGNITION FOR PILOT #2 BEGINS. WHEN ALL PILOTS ARE PROVEN THE SAFETY SHUTOFF VALVE

MAY BE MANUALLY OPENED. FLAME FAILURE OF ANY BURNER WILL TRIP THE MAIN FUEL VALVE AND

SOUND ALARM. 

THE TOTAL CONNECTED LOAD MUST NOT EXCEED THE RATING OF THE FIRST CONTROL.

VALVE

RELAY COIL

MAIN GAS VALVE

GAS VALVE

RELAY

GAS VALVE

SWITCH

SWITCH

Содержание M-SERIES II

Страница 1: ...e are deter mined by the programmer module Type of flame scanner UV or Flame Rod and Flame Failure Response Time F F R T are determined by the amplifier module LED indicator lights on all programmer m...

Страница 2: ...125 VA pilot duty solenoid valve plus 250 VA Transformer 5 Main Fuel Valve s 125 VA pilot duty solenoid or 25 VA pilot duty solenoid and 400 VA opening motorized 8 Motor or contactor Motor normally e...

Страница 3: ...TRAIGHT FEMALE PIPE THREAD 1 DIA 25 4 UV1A UV SCANNER 36 FLEXIBLE CABLE UV1A3 72 FLEXIBLE CABLE UV1A6 2 50 8 36 1m APPROX FLEXIBLE CABLE 3 8 PIPE THREAD 13 16 DIA 206 UV2 UV SCANNER 2 3 8 60 3 1 3 16...

Страница 4: ...he following Chassis UV Scanner or Flame Detector Programmer Module Wiring Base Amplifier Module WARNING Installer must be trained and qualified Follow the burner manufacturer s instructions if suppli...

Страница 5: ...b a window coupling Fireye part 60 1257 to seal off furnace or burner pressure c cooling air to reduce the scanner sight pipe temperature 3 Mount rigidly a short length 10 20cm of 1 2s or 3 4s black...

Страница 6: ...Scanner Installations Wiring of UV Scanners The UV1A scanner is supplied with 3 90cm or 6 180cm of flexible cable The UV 2 scanner is supplied with 3 90cm of flexible cable If it is necessary to exte...

Страница 7: ...e from the side so as to safely prove an adequate pilot flame under all draft conditions 4 If the flame is nonluminous air and gas mixed before burning the electrode tip should extend at least 1 2s 12...

Страница 8: ...30M Maximum wiring run not to exceed 400 feet 120M MAINTENANCE Type UV1 UV2 UV8A and 45UV3 Ultraviolet Scanners The viewing area of the scanner must be kept clean Even a small amount of contamination...

Страница 9: ...is energized only during the Ignition Safety Time Flame On This LED is energized whenever a flame signal is detected by the UV scanner or Flame detector Alarm this LED is energized whenever a safety...

Страница 10: ...ition is initiated PTFI LED lit 3 When main flame is detected Flame LED lit KF 1 closes energizing Terminal 5 which pow ers the secondary main fuel valve if used KF 2 opens de energizing Terminal 4 wh...

Страница 11: ...for flame rectification amplifiers 5 Inadequate flame signal may be improved by a Assuring that the flame detector and wiring installations have followed the instructions on Pages 5 through 9 b Assuri...

Страница 12: ...gnition and pilot valve to Terminal 3 2 Initiate a normal startup 3 Manually shut off all fuel and observe the loss of flame signal on the test meter 4 If flame signal does not reduce to zero within t...

Страница 13: ...clean Use a clean cloth with detergent as often as oper ating conditions require Remove any residual detergent ROTATION It is recommended that units purchased as spares be rotated periodically so tha...

Страница 14: ...NG SUCCESSFUL RESET REPLACE PROGRAMMER DID FLAME LED COME ON YES MP100 4 7 SECONDS MP230 PREPURGE DELAY TIME NO YES NORMAL LOCKOUT NO NO NO NO NO YES AMPLIFIER DEFECTIVE OR MC120 REPLACE SCANNER REPEA...

Страница 15: ...IN BURNER NO TROUBLESHOOTING TIPS 1 Verify that there is a solid earth ground wire brought to the panel that the Fireye base is mounted to 2 In a rectification system verify that terminal S1 is solidl...

Страница 16: ...ME ROD FUEL VALVE CHASSIS WITH MART3 OR MART1T AMPLIFIER MODULES IGNITION GAS VALVE CONNECTION TO TERMINAL 1 IS NOT REQUIRED WITH MART3 OR MART1T AMPLIFIER MODULE WITH MAUV3 AND MAUV1T KB ENERGIZED WH...

Страница 17: ...DDED TO REQUIRE OPERATOR START UP EACH TIME THE BURNER FIRES S2 3 5 4 1 IGNITION 7 8 2 A 6 PILOT S1 B MULTIPLE BURNER SYSTEMS S2 3 5 4 1 IGNITION 7 8 2 A 6 PILOT S1 LIMIT R MANUAL RESET MAIN GAS VALVE...

Страница 18: ...ted in these general terms and conditions of sale remedies with respect to any product or part number manufactured or sold by Fireye shall be limited exclusively to the right to replace ment or repair...

Отзывы: