Firewarm 4KW Insert Скачать руководство пользователя страница 1

 
 

 

 

Firewarm 4KW Insert 

 
 

HD Insert Stove 04D 

 

MULTI FUEL 

INSERT S T O V E  

FOR STANDARD 16” FIREPLACE 

OPENING 

 

Installation and Operating 

Instructions 

 
 

Please hand these instructions to the stove user when the 
installation is complete. Leave the system ready for operation 
and instruct the user in the correct use of the appliance and 
operation of controls. 
 
Installation – We strongly recommend installation by a 
qualified plumber or suitably qualified fitter  
 

 
 
 

Содержание 4KW Insert

Страница 1: ...ating Instructions Please hand these instructions to the stove user when the installation is complete Leave the system ready for operation and instruct the user in the correct use of the appliance and...

Страница 2: ...through incorrect installation The HD Insert Stove is only suitable for installation in a solid fuel fireplace the fireplace must be capable of withstanding the high temperatures generated by this st...

Страница 3: ...lowed to come into contact with the skin In case of contact wash immediately with plenty of water 3 Remove the grate Place the insert stove in position on the hearth and push it flush against the fire...

Страница 4: ...lace Remove the baffle plate Place hand through the stove flue collar and tighten the wing nut on the tightening bar The fixing bar creates pressure when it contacts the chimney lintel The stove shoul...

Страница 5: ...Door Handle 1 Airwash Control Handle 1 Primary Air Caps 2 Ash Pan 1 Ash Pan Tool 1 Coal Guard 1 Baffle Plate 1 Fixing Bar 1 M8 Bolt 1 M8 Nut 1 Tightening Screw 1 Wing Nut 1 M6 Bolt 1 M6 Nut 1 Floor f...

Страница 6: ...dance and use appropriate protective equipment Metal Parts When installing or servicing this stove care should be taken to avoid the possibility of personal injury Please note Any white deposits on th...

Страница 7: ...have any doubts about the suitability of your chimney consult your local dealer stockist If there is no existing chimney then either a prefabricated block chimney or a twin walled insulated stainless...

Страница 8: ...t full output for at least 3 4 days On completion of the installation and commissioning ensure that the operating instructions and operating tools for the stove are left with the customer Ensure to ad...

Страница 9: ...used correctly It is essential that the stove has an adequate air supply for combustion and ventilation The primary and secondary air inlets must be kept clear from obstruction Note The secondary air...

Страница 10: ...he ash pan should be emptied at least twice a day or when the level of ash reaches the top of the ash pan On no account should the ash be allowed to build up to touch the grate as this will greatly sh...

Страница 11: ...any part of the stove starts to glow red the fire is in an overfire situation and the controls should be adjusted accordingly Never leave the stove unattended for long periods without first adjusting...

Страница 12: ...All of our multi fuel and wood burning stoves require a suitable chimney or professionally installed flue system 3 How do I clean the chimney You will require a chimney sweep to clean the chimney It i...

Страница 13: ...rior to fitting the stove to ascertain the integrity of the flue Alternatively the insert stove may smoke if it is not sealed correctly to the fireplace fascia 10 Why should I Run in my stove To begin...

Страница 14: ......

Отзывы: