Firesense LIP-10A-TGG-NTS-1 Скачать руководство пользователя страница 12

 

12 

 

 

 

3. If leak is detected at regulator/gas source valve

 

connection, disconnect, reconnect, and perform another leak 

test. If you continue to see bubbles after several attempts, cylinder valve is defective. Call our customer service 
hotline at 

1-866-985-7877

, 9 a.m. – 6 p.m., EST, Monday – Friday   

 

IF NO BUBBLES APPEAR AT ANY CONNECTION, THE CONNECTIONS ARE SECURE. 
Note: Whenever gas connections are loosened or removed, you must perform a complete leak test. 

 
 
 
 
 
 
 
 
 
 
 

Caution: 

Do not attempt to operate this appliance until you have read and understand all Safety Information in 

this manual and all assembly is complete and leak tests have been performed. 

 

Before Turning Gas Supply ON

1. Your heater was designed and approved for OUTDOOR use only. Do NOT use it inside a building, garage, or 
any other enclosed area. 
2. Make sure surrounding areas are free of combustible materials, gasoline, and other flammable vapors or 
liquids. 
3. Ensure that there is no obstruction to air ventilation. Be sure all gas connections are tight and there are no 
leaks. 
4. Be sure the natural gas cover

 

is clear of debris. Be sure any component removed during assembly or servicing 

is replaced and fastened prior to starting. 
 

Before Lighting

1. Heater should be thoroughly inspected before each use, and by a qualified service person at least annually. If 
re-lighting a hot heater, always wait at least 5 minutes. 
2. Inspect the hose assembly for evidence of excessive abrasion, cuts, or wear. Suspected areas should be leak 
tested.  If  the  hose  leaks,  it  must  be  replaced  prior  to  operation.  Only  use  the  replacement  hose  assembly 
specified by the manufacturer. 
 

Lighting

NOTE

: For initial start or after any natural gas source, hold the control knob in for 2 minutes to purge air from 

all gas lines before proceeding. 
 

1. Turn the control knob to the “OFF” position. 
2. Fully open the gas source valve. 
3. Turn the control knob half way between the small flame and the large   
flame symbols. 
4. Push control knob in and then push the RED igniter button to ignite the 
main burner. Repeat until the burner ignites. Keep the control knob fully   
pushed in for an additional 30 seconds after the burner ignites, then   
release the control knob. 
5. To increase the flame, turn the control knob clockwise toward the large 
flame symbol. To decrease the flame, turn the control knob counter   
clockwise towards the small flame symbol. 
6. To turn the appliance OFF, push down the control knob and turn   
clockwise to the OFF position. 
7. Wait at least 5 minutes before attempting to re-light the heater. 
8. Turn the natural gas source valve to OFF or closed. 

If you experience any ignition problems, please consult “Troubleshooting” on page 15. 

Caution

: Avoid inhaling fumes emitted from the heater’s first use. Smoke and odor from the burning of oils used in the manufacturing will 

appear. Both smoke and odor will dissipate after approximately 30 minutes. The heater should NOT produce thick black smoke. 

 

 

OPERATING INSTRUCTIONS 

Содержание LIP-10A-TGG-NTS-1

Страница 1: ...Serial Number ___________ Purchase Date ________ Manufacturer Changzhou Wellife Furnace Co Ltd Questions problems missing parts Before returning to your retailer call our customer service hotline at 1...

Страница 2: ...bly operation and maintenance of this patio heater General safety information is presented in the first few pages and is also located throughout this manual Keep this manual for future reference and t...

Страница 3: ...3 SAFETY INFORMATION...

Страница 4: ...4 SAFETY INFORMATION...

Страница 5: ...Y PART DESCRIPTION QTY A Reflector Panel 4 pcs packed in 2 inner ctns B Reflector Center Cap 1 C Head Assembly 1 packed in 1 inner ctn D Main Post 2 E Gas Hose 1 attached to Head Assembly F Lower Post...

Страница 6: ...ot attempt to assemble this product Contact customer service for replacement parts ESTIMATED ASSEMBLY TIME 60 minutes Tools Required for Assembly NOT included Philips Head Screwdriver with Medium Blad...

Страница 7: ...Using the holes in the Base as a template drill 4 12 5 13mm diameter holes 1 2 that are at least 300mm 4 deep Fig 1 Then insert the Expandable Bolts 4 pcs into the holes Fig 2 Slide the Base down over...

Страница 8: ...er Post with the holes in the Base and insert 6 M6x12 Bolts through Lock Washers and into the holes and hand tighten Hardware Used 6 M6x12 Bolt with Lock Washer 3 Slide the Base Cover H over the Lower...

Страница 9: ...ctor Center Cap B Reflector Panels A come packaged in two brown boxes with two panels in each box Hardware for assembly is already affixed to each panel Place two panels side by side and remove the tw...

Страница 10: ...n the heater to an upright position Hardware Used 3 M8 Wing Nuts 3 M8 Washers 9 Connect the hose and regulator from natural gas company to the natural gas outlet The natural gas is obtained from your...

Страница 11: ...d marked in accordance with the specifications for gas source supplier of the U S Department of Transportation DOT or the standard for cylinders spheres and tubes for transportation of dangerous goods...

Страница 12: ...Inspect the hose assembly for evidence of excessive abrasion cuts or wear Suspected areas should be leak tested If the hose leaks it must be replaced prior to operation Only use the replacement hose a...

Страница 13: ...onnections are secure and do not leak 5 Wind velocity is below 10 mph 6 Unit will operate at reduced efficiency below 40 degrees F 7 Heater is for use outdoors outside any enclosure 8 There is adequat...

Страница 14: ...urner holes by using a heavy duty pipe cleaner Compressed air may help clear away smaller particles Carbon deposits may create a fire hazard Clean dome and burner screen with warm soapy water if any c...

Страница 15: ...press control knob for 2 3 mins Loose connection Check all fittings Igniter fails Use stick lighter to manually light Gas pressure low with valve open full Replace gas source supplier regulator New cy...

Страница 16: ...77 9a m 6 p m EST Monday Friday or email us at cservice welltraveled net REPLACEMENT PARTS LIST ASSEMBLY PART DESCRIPTION QTY A Reflector Panel 4 pcs packed in 2 inner ctns B Reflector Center Cap 1 C...

Страница 17: ...UCTIONS CONTAINED IN THIS MANUAL CAN RESULT IN SEVERE PROPERTY DAMAGE AND OR PERSONAL INJURY IN NO EVENT WILL WELL TRAVELED LIVING OR ITS DIRECTORS OFFICERS OR AGENTS BE LIABLE TO THE PURCHASER OR ANY...

Отзывы: