background image

Bay AG Installation 

 

Please leave this manual with the owner after installation

 
 

Your warranty card is enclosed and may be completed and returned to us. 

 

 
 

INDEX 

 
 

DIAGRAMS: 

Page 4             Firebox, Fascia & Floor Protector Dimensions 
Page 6  

Builtin Fire Canopy Dimensions 

Page 7             Builtin Fire Canopy Assembly 
Page8,9,10,11 Builtin Fire Canopy Framing Guide 
Page 13, 14   Raised Builtin Fire Canopy Framing Guide 
Page 15 

Cavity Chimney Termination 

Page 18            Insert Flue System for Masonry Fireplace 
Page 19            Minimum Height of Flue Outlet 
Page 20            Typical Insert Installation Diagram 
 
 
 
 

PAGE:  

ITEM: 

 

Warnings 

 

 

Firebox, Fascia & Floor Protector Dimensions 

 

Floor Protector Requirements 

6-12 

 

Builtin Fire Canopy 

13-14   

 

Raised Builtin Fire Canopy 

15 

 

 

Built In Fire – Cavity Chimney Termination 

16 

 

Pre-Installation & Mantels 

17 

 

Assembly Instructions 

18 

 

Insert Flue System for Masonry Fireplace 

19 

  

  

Minimum Height of Flue Outlet 

20 

 

 

Typical Insert Installation 

21 

 

Fascia Assembly & Installation 

 
 

 

 

 

 

 

 

                      

                                                                                                                            

Athena 

  
 
 
 
 
 
 

Edited 2/5/2011   

 

 

 

 

                  Forte 

Содержание Athena Bay AG

Страница 1: ......

Страница 2: ...15 Cavity Chimney Termination Page 18 Insert Flue System for Masonry Fireplace Page 19 Minimum Height of Flue Outlet Page 20 Typical Insert Installation Diagram PAGE ITEM 3 1 Warnings 4 Firebox Fascia...

Страница 3: ...AMMABLE LIQUIDS OR AEROSOLS IN THE VICINITY OF THIS APPLIANCE WHEN IT IS OPERATING Use caution when reloading with fuel Do NOT attempt to load fuel into the heater when the fire inside the stove is at...

Страница 4: ...Bay AG Installation 4...

Страница 5: ...OR PROTECTOR CONSTRUCTION An Insulated Floor Protector shall be a minimum thickness of 40mm consisting of 20mm of an approved insulation material i e 2 sheets of 10mm micorboard or superlux 10mm tile...

Страница 6: ...lation 6 3 BUILT IN FIRE CANOPY A Built In Fire Canopy is required if the fire is not being installed into a masonry fire place For Built In Fire Canopy installations see the following pages 6 7 8 9 1...

Страница 7: ...Bay AG Installation 7...

Страница 8: ...Bay AG Installation 8 BUILT IN FIRE CANOPY INSTRUCTONS FOR NON MASONARY INSTALLATION...

Страница 9: ...Bay AG Installation 9...

Страница 10: ...Bay AG Installation 10...

Страница 11: ...Bay AG Installation 11...

Страница 12: ...Bay AG Installation 12...

Страница 13: ...Bay AG Installation 13...

Страница 14: ...Bay AG Installation 14...

Страница 15: ...Bay AG Installation 15 Built In Fire Canopy Instructions...

Страница 16: ...ial MANTEL Masonry Fireplace If the mantel shelf is of a combustible material there should be a minimum distance above the top of the fascia of 300mm This may be reduced if a deflector or heat shield...

Страница 17: ...place 25mm white kaowool blanket supplied on top of casing 7 As this fire sources its combustion air from the chimney cavity enclosure the fire MUST be sealed around the front between the casing and t...

Страница 18: ...chimney top The chimney plate must be weather sealed with silicone or mortar 4 Install chimney liner on top of the chimney plate 5 Ensure flue pipe is extended over the chimney liner by 180mm Secure...

Страница 19: ...Bay AG Installation 19...

Страница 20: ...Bay AG Installation 20...

Страница 21: ...tighten 7 The screw on the bay section may now require adjusting to support canopy 8 Fit upper cast grill on side locaters 9 Fit control knob FORTE WITH BAY DOOR 1 Remove screws fixed to lugs on fire...

Страница 22: ...WITSONS LIMITED Manufacturers of Lady Kitchener Contessa Coaster Bronte Viking Zealandia Royale Athena Forte Deco Plaza Aqualux 68 Austin Street PO Box 3231 HB Mail Centre Napier 4142 Phone 06 8438260...

Отзывы: