Bay AG Installation
16
4. PRE - INSTALLATION
(Refer diagram page 4)
In a Masonry Fireplace:
Before installing your Firenzo Insert it is important to check the condition of your
masonry chimney. Ensure any cracks are sealed, loose masonry repaired and the chimney
swept.
Check the dimensions of your fireplace opening. Firebricks may need to be removed and
the floor of the opening should be level using mortar if necessary.
Ensure any gaps between the chimney face and fireplace surround are sealed with heat
resistant material.
MANTEL – Masonry Fireplace
If the mantel shelf is of a combustible material there should be a minimum distance above
the top of the fascia of 300mm. This may be reduced if a deflector or heat shield is fitted
under the mantel.
MANTEL – using BUILT IN FIRE CANOPY
FORTE BAY – Can NOT have a combustible mantel, however if the mantel is made of a
non heat sensitive material then the minimum distance above the top of the fascia must be
500mm.
ATHENA BAY – The minimum distance above the top of the fascia to a combustible or
non-combustible mantel is 500mm.
SIDE SURROUNDS – MASONRY & BUILT IN FIRE CANOPY
Clearance between the fascia and any wooden side surround must be 50mm providing the
timber protrudes no more than 100mm.
Содержание Athena Bay AG
Страница 1: ......
Страница 4: ...Bay AG Installation 4...
Страница 7: ...Bay AG Installation 7...
Страница 8: ...Bay AG Installation 8 BUILT IN FIRE CANOPY INSTRUCTONS FOR NON MASONARY INSTALLATION...
Страница 9: ...Bay AG Installation 9...
Страница 10: ...Bay AG Installation 10...
Страница 11: ...Bay AG Installation 11...
Страница 12: ...Bay AG Installation 12...
Страница 13: ...Bay AG Installation 13...
Страница 14: ...Bay AG Installation 14...
Страница 15: ...Bay AG Installation 15 Built In Fire Canopy Instructions...
Страница 19: ...Bay AG Installation 19...
Страница 20: ...Bay AG Installation 20...