Kompact AG Installation—November 2018 4
2. INSTALLATION RESPONSIBILITIES
WARNING:
The Fire and Flue system must be installed in accordance with AS/NZS
2918:2001 and the appropriate requirements of the relevant NZ Building Code or Codes. If
the flue system has been AS/NZS 2918:2001 Appendix F tested by the flue system
manufacturer then their specifications for the installation of the flue system must be
adhered to.
Any modification of the Fire that has not been approved in writing by the testing
authority is considered to be in breach of the approval granted for compliance with
AS/NZS 4013.
CAUTION:
Mixing of Fire or Flue
-
system components from different sources or
modifying the dimensional specification of components may result in hazardous
conditions. Where such action is considered, the manufacturer should be consulted in the
first instance.
Strict adherence to these instructions will meet these standards. Any variation from these
installation instructions or any doubt about them must be checked against the
requirements of the standards.
Please leave this manual with the owner when installation is complete.
KOMPACT ZERO CLEARANCE BOX
IN A MASONRY FIREPLACE OR ENCLOSURE
3. FLOOR PROTECTION REQUIREMENTS
AS/NZ2918 Section 3.3 states that if the Fire is to be placed on or within 500mm of
heat
sensitive materials in the floor
, then a
floor protector will be required. This floor
protector shall extend under the Fire and not less than 300mm beyond the front of the fuel
loading or ash removal openings. The width of the floor protector shall be not less than the
width of the Fire and shall extend not less than 200mm from each side of the fuel loading
or ash removal openings unless it forms an abutment with a wall or heatshield at a lesser
distance.
The Fire and floor protector must be fixed to the floor for seismic restraint. Anchor points
for the Fire are provided through the 2 front feet of the Fire.
Содержание Kompact AG Series
Страница 9: ...Kompact AG Installation November 2018 9 6 TYPICAL INSULATION REQUIREMENTS ...
Страница 15: ...Kompact AG Installation November 2018 15 ZERO CLEARANCE BOX Built in Fire Canopy ...
Страница 18: ...Kompact AG Installation November 2018 18 ZERO CLEARANCE BOX Built in Fire Canopy ...
Страница 19: ...Kompact AG Installation November 2018 19 ZERO CLEARANCE BOX Built in Fire Canopy ...
Страница 20: ...Kompact AG Installation November 2018 20 ZERO CLEARANCE BOX Built in Fire Canopy ...
Страница 21: ...Kompact AG Installation November 2018 21 ZERO CLEARANCE BOX Built in Fire Canopy ...
Страница 22: ...Kompact AG Installation November 2018 22 ZERO CLEARANCE BOX Built in Fire Canopy ...
Страница 25: ...Kompact AG Installation November 2018 25 12 INSTALLATION OF KAOWOOL AND ISB INSULATION IN A ZERO CLEARANCE BOX ...
Страница 27: ...Kompact AG Installation November 2018 27 14 KOMPACT WITH ATHENA FASCIA ...
Страница 29: ...Kompact AG Installation November 2018 29 KOMPACT WITH DECO FASCIA ...
Страница 31: ...Kompact AG Installation November 2018 31 Assembly and Installation Instructions KOMPACT with DIVA Fascia ...
Страница 33: ...Kompact AG Installation November 2018 33 KOMPACT WITH FORTE FASCIA ...
Страница 34: ...Kompact AG Installation November 2018 34 Assembly and Installation Instructions KOMPACT with FORTE Fascia ...
Страница 35: ...Kompact AG Installation November 2018 35 KOMPACT WITH 780MM PLAZA FASCIA 780mm Fascia Masonry ONLY ...
Страница 37: ...Kompact AG Installation November 2018 37 Assembly and Installation Instructions KOMPACT with PLAZA Fascia ...
Страница 45: ...Kompact AG Installation November 2018 45 ...