P77-3 SC30 Manual 9.27.2019 Page 50
Curing of the refractory has been factory done. If any new
refractory is added later it is essential to cure prior to
burning the first load of waste. See "REFRACTORY CURING
PROCEDURE" table.
1. Remove ashes before loading the incinerator.
2. Load incinerator. Keep the waste 6"-8" away from the burner port.
3. Start upper timer with desired hours time. Upper burner fires and preheat starts.
After preheat is satisfied start lower timer with desired hours time (starts lower burner).
4. The incinerator will automatically shut off when the upper timer ends.
5. For best results, burn daily to a white ash. Load waste near hot part of flame.
REFRACTORY CURING PROCEDURE
Table 1: REFRACTORY CURING PROCEDURE
Procedure
Time
Start burner and burn for
5 minutes
Allow to cool for
15 minutes
burn
5 minutes
cool
15 minutes
burn
15 minutes
cool
15 minutes
burn
15 minutes
cool
15 minutes
burn
30 minutes
cool
15 minutes
burn
30 minutes
cool
15 minutes
burn
1 hour
cool
15 minutes
burn
1 hour
cool
15 minutes
burn
1 hour
cool
15 minutes
burn
2 hour
cool
15 minutes
burn
3 hours
Total Time
12 hours(approximate)
Curing creates hairline cracks, minor scaling of the refractory after
curing is complete. This is a normal result of the curing process.
Содержание P77-3-SC30
Страница 2: ...P77 3 SC30 Manual 9 27 2019 Page 2 PERSONAL PROTECTIVE EQUIPMENT FOR CRUSHING HEAT ABRASION AND DUST ...
Страница 3: ...P77 3 SC30 Manual 9 27 2019 Page 3 ...
Страница 12: ...P77 3 SC30 Manual 9 27 2019 Page 12 ...
Страница 28: ...P77 3 SC30 Manual 9 27 2019 Page 28 MIDCO BURNER J121 DS EXPLODED VIEW ...
Страница 30: ...P77 3 SC30 Manual 9 27 2019 Page 30 MIDCO BURNER J83 DS EXPLODED VIEW See parts list on following page ...
Страница 32: ...P77 3 SC30 Manual 9 27 2019 Page 32 BECKETT BURNER AF EXPLODED VIEW See parts list on following page ...
Страница 36: ...P77 3 SC30 Manual 9 27 2019 Page 36 ...
Страница 37: ...P77 3 SC30 Manual 9 27 2019 Page 37 MIDCO BURNER INTERNAL WIRING ORANGE L1 ...
Страница 38: ...P77 3 SC30 Manual 9 27 2019 Page 38 INCINERATOR WIRING DIAGRAM ...
Страница 39: ...P77 3 SC30 Manual 9 27 2019 Page 39 ...
Страница 40: ...P77 3 SC30 Manual 9 27 2019 Page 40 ...
Страница 41: ...P77 3 SC30 Manual 9 27 2019 Page 41 LINKAGE DIAGRAM ...
Страница 44: ...P77 3 SC30 Manual 9 27 2019 Page 44 ...
Страница 45: ...P77 3 SC30 Manual 9 27 2019 Page 45 FDC Future Design Control Specification Review ...